Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Detachable road steel bridge handling and erecting vehicle with general height installation

A technology of dismantling and erecting vehicles, which is applied in bridge construction, erection/assembly of bridges, bridges, etc. It can solve problems such as the inability to realize the handling and erection of trusses and beams, the difficulty in carrying items of different specifications, and the inability to achieve ultra-low-level operations. Achieve the effects of expanding versatility and scope of application, fast placement, easy maintenance and guarantee

Active Publication Date: 2019-04-09
NAT UNIV OF DEFENSE TECH
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

There are currently two types of auxiliary erection equipment for prefabricated highway steel bridges. One is propulsion equipment, such as flat rolls, rockers, lower string joints, and inclined chords, and the other is installation tools, such as wrenches, crowbars, and mallets. etc., but none of these devices can realize the handling and erection of trusses and beams
[0004] Although the existing transport and erection equipment (vehicles) can carry and erect trusses and beams, most of the existing transport and erection equipment (vehicles) are integrally non-detachable, and their positions are fixed and invariable. The lifting of the hydraulic oil pipe of the auxiliary operation equipment is adjusted, and the equipment itself cannot be adjusted, so it is difficult to carry items of different specifications; considering the complex and changeable operation area, sometimes the height of the truss may be close to the height of the upper surface of the forklift, and it will not be possible to operate at this time, and it will not be possible to achieve super Low-level operation; due to the excessive friction between the surface of the shelf and the truss, the movement is laborious, which affects the efficiency of the truss docking

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Detachable road steel bridge handling and erecting vehicle with general height installation
  • Detachable road steel bridge handling and erecting vehicle with general height installation
  • Detachable road steel bridge handling and erecting vehicle with general height installation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0036] As shown in Figure 1(a) and Figure 1(b), the detachable highway steel bridge transport and erection vehicle installed at a general height is composed of a central lifting roller assembly 1, a car body 2 and a lifting plate assembly 3, and the central lifting roller The component 1 straddles the two forks of the vehicle body 2 and is installed on the middle side of the vehicle body 2 along the vertical direction; the lifting plate assembly 3 is installed on the rear side of the vehicle body 2 .

[0037] like figure 2 As shown, the central lifting roller assembly 1 is composed of a central mounting seat assembly 11, a pin shaft 12, a lifting roller assembly 13, and a retaining ring assembly 14; there is at least one first position adjustment on the central mounting seat assembly 11 hole 110, there is at least one second position...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a detachable highway steel bridge carrying and erecting vehicle of average height installation. The vehicle comprises a middle lifting roller assembly, a vehicle body and a lifting plate assembly; the middle lifting roller assembly is detachable and the position is adjustable, two forks crossing the vehicle body is horizontally installed in the middle of the vehicle body in the vertical direction; the lifting plate assembly mounted behind the vehicle body is detachable and the position is adjustable. Compared with the prior art, most of the components are detachable and it is not necessary to change any structures of the existing forklift; modular design is adopted, most of the components in assemblies is in common use and easy to maintain and manage; the structure of the erecting vehicle is adjustable, which is capable of completing ultralow posture work; a guider roller is replaced by a detachable retainer ring and therefore the work flexibility is increased. And the retainer ring can adjust position according to the need and is suitable for beams with various specifications and sizes; after the vehicle body is additionally provided with a front lifting roller assembly, the labor intensity is reduced and posture of devices including a truss and the like can be guaranteed.

Description

technical field [0001] The invention belongs to the technical field of engineering operation equipment, and in particular relates to a detachable highway steel bridge transporting and erecting vehicle installed at a general height. Background technique [0002] Prefabricated highway steel bridges, as one of the war preparation materials reserved by the Ministry of Communications on behalf of the country, have been widely used for decades, whether in wartime highway bridge repairs and rush construction, overcoming river obstacles, or in peacetime earthquake and flood rescue and disaster relief , traffic security are playing an irreplaceable role. [0003] During the erection process of the prefabricated highway steel bridge, it is necessary to rely on manpower to move the trusses, beams, etc. to the transport and erection vehicle, and then carry out docking. There are currently two types of auxiliary erection equipment for prefabricated highway steel bridges. One is propulsi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 宋殿义黄益民徐伟
Owner NAT UNIV OF DEFENSE TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products