Method for removing covering soil in mine tunnel
A technology of tunnel and soil covering, applied in the direction of earth mover/shovel, construction, etc., can solve the problems of reducing the service life of tooth bar and tooth tip, working load, large impact load, and increasing cost, so as to facilitate excavation and transfer. , The effect of reducing the cutting resistance and reducing the contact area
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] Such as figure 1 with figure 2 As shown, this embodiment includes a square connecting plate 1, ear plates 2 with shaft holes 4 are installed on both sides of the upper part of the connecting plate, and a trapezoidal reinforcing plate 3 is welded between the two ear plates 2, An arc-shaped gear bar 6 with bucket teeth 9 is welded at the middle of the bottom of the connecting plate 1, and a reinforcing plate 5 is welded between the square peripheral edge of the connecting plate 1 and the outer wall of the gear bar 6, An alloy sheath 7 is installed on the inner side of the arc-shaped curved surface of the tooth bar 6 through a pin shaft, and a gear sleeve 8 is installed on the upper part of the bucket tooth 9 through a pin shaft. An arc-shaped diversion groove 10, and the diversion groove 10 extends along the direction from the bottom of the bucket tooth 9 to the bottom of the tooth sleeve 8, and the depth of the diversion groove 10 increases along its extending directio...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

