Campus shallow well engineering situation teaching area implementation method
An implementation method and technology of teaching area, applied in the field of geology teaching, which can solve the problems of time and place being unified and simultaneous.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention.
[0030] The application principle of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0031] see figure 1 and figure 2 :
[0032] A method for implementing the situational teaching area of shallow well engineering in a school includes:
[0033] S101. Positioning: according to the layout plan and shallow well design drawings, use white paint to position the construction area;
[0034] S102, laying the foundation: excavate the foundation at the position where the line is drawn, and dig to a depth of 30cm;
[0035] S103. Building wal...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com