Restoration Method of Existing Railway Line Tunnel Foundation Drainage Anchor Grouting
A repair method and technology for railway lines, applied in the field of repair, can solve problems such as hidden safety hazards of ballast slab lifting, increase construction cost, and deformation of tunnel bottom, so as to ensure the slurry filling effect and anchoring effect, ensure safety, and avoid re-lifting. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] Next, the existing railway tunnel base drainage anchoring grouting repair method (XMZ method) of the present invention will be described in detail with reference to the accompanying drawings.
[0026] First, please refer to Figure 1-2 , in step S1, a section Q to be treated is set every 20 meters along the longitudinal direction of the tunnel, and each section Q to be treated includes a top surface (not shown) formed by the plane where the vault of the section to be treated is located, The bottom surface (not numbered) formed by the plane of the track bed slab of the section to be treated, and the first side 100 and the second side 200 formed by the planes of the two side walls W1 and W2 of the section to be treated.
[0027] Next, in step S2, on the first side 100 and the second side 200 of each section to be treated, ten weep holes A are formed at equal intervals on the two lining surfaces. The setting of weep holes A can not only It ensures the smooth progress of t...