PDA based onsite maintenance day work planning method
A technology of operation and maintenance and planning, applied in the field of labor dispatch, can solve problems such as waste of operation and maintenance resources, low efficiency, and difficult judgment of workload, and achieve the effect of optimizing urgency and capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0069] The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0070] Such as figure 1 Shown, the present invention comprises the following steps:
[0071] 1) Obtain abnormal work orders generated by aggregation of abnormal points;
[0072] 2) Filter abnormal work orders according to the dispatch area;
[0073] 3) Calculate the shortest path from the maintenance point to the stagnation point and the mutual shortest path of the abnormal work order;
[0074] 4) Generate a repeating path matrix according to the shortest path from the maintenance point to the stagnation point and the mutual shortest path;
[0075] 5) generate a preliminary route list by scanning the repeated route matrix, and obtain the preliminary dispatch route;
[0076] 6) Preliminary routes are sorted in descending order of urgency;
[0077] 7) Select the preliminary route with the greatest urgency, and judge whether to add...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com