Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

72 results about "Work planning" patented technology

Work plans (often shown as Gantt charts) show all the tasks involved in a project, who is responsible for each task, and when the tasks will be completed. Donors normally require you to submit a work plan as part of a proposal.

Workforce planning system incorporating historic call-center related data

Systems and methods for workforce planning, which in one embodiment among many, can be broadly summarized by a representative method of generating a forecast report by processing a work-planning input together with a performance report, the performance report having been generated by processing a call-history statistic obtained from a communication switch and / or a work-history statistic obtained from a call center. Another embodiment can be described as a workforce planning system that has logic configured to generate a forecast report by processing a work-planning input together with a performance report, the performance report having been generated by logic configured to process a call-history statistic obtained from a communication switch and / or a work-history statistic obtained from a call center.
Owner:AT&T INTPROP I L P

Robot controller

A robot controller for teaching a robot with high efficiency. The robot controller including command storage unit (21) where a movement command and a work command are stored, command identifying unit (24) for discriminating between the movement and work commands, unit (22) for making / editing a series of work programs or discrete work programs by a combination of the commands, work program storage units (23) where the work programs are stored so as to control the robot according to the stored program, further including a work section identifying unit (25) for identifying a work section of the work program by way of the command identification unit (24) and work section automatic stopping unit (27) for automatically stopping or suspending the execution of the work program at the work section in a standby state when the work section identifying unit (25) identifies the work section during the execution of the work program.
Owner:YASKAWA DENKI KK

Jobstream planner considering network contention & resource availability

Disclosed is a computer-implemented planning process that aids a system administrator in the task of creating a job schedule. The process treats enterprise computing resources as a grid of resources, which provides greater flexibility in assigning resources to jobs. During the planning process, an administrator or other user, or software, builds a job-dependency tree. Jobs are then ranked according to priority, pickiness, and network centricity. Difficult and problematic jobs then are assigned resources and scheduled first, with less difficult jobs assigned resources and scheduled afterwards. The resources assigned to the most problematic jobs then are changed iteratively to determine if the plan improves. This iterative approach not only increases the efficiency of the original job schedule, but also allows the planning process to react and adapt to new, ad-hoc jobs, as well as unexpected interruptions in resource availability.
Owner:KYNDRYL INC

Extended work program

An extended work program (EWP) is provided in which unemployed and under-employed workers perform atomic units of work. The inventive system and method includes an administrative system, employer systems and participant systems, each of which communicates over the Internet. Employers locate EWP participants by querying an administrative system, which provides information regarding a pool of participants and further announces the available work to the pool. After suitable candidates are located, the administrative system, in conjunction with the employers' systems, trains, evaluates, and compensates EWP participants on an atomic unit of work basis. The participants communicate, in a human-centric trusted computing environment, with the employers through the administrative system.
Owner:AMERICAL INTERNATIONAL GROUP INC

Method and system for virtualized composite project work schedules

Some embodiments provide a system for electronically generating a virtualized work schedule based on a composite of data gathered from multiple work planning, scheduling and other management information systems utilized in structured maintenance projects for a large-scale assets during a scheduled maintenance period. The system can include a schedule management system configured to facilitate communications among workers and managers during the scheduled maintenance period and expedite completion of the structured maintenance project.
Owner:PIPELINE SOFTWARE

Method and apparatus for creating work plan

Creation of detailed work plan related to works of assembling a large scale structure, such as plant construction, is aided by enabling parallel works on plural components in a work area and avoiding spatial interference between works. A method for creating detailed work plans includes step of generating component groups by dividing plural components for large scale structure into work assignment units, step of assigning the respective component groups to one or more work teams assigned in an outline process plan, step of creating each detailed work plan by determining the execution sequences of detailed works on component-by-component basis in a corresponding work team, using work sequence restriction and a work priority rule, and step of avoiding work interference that revises the execution sequence of the detailed works such as to avoid overlapping between work spaces among the determined detailed works if spatial overlapping is present among detailed works.
Owner:HITACHI LTD

Method and System for Real-Time Automatic Optimization of Emergency Room Resources Management

The invention discloses a computer implemented method and system for real-time optimal management of hospital's Emergency Room resources. The system provides optimal work plan for crewmembers and equipment, taking into consideration relevant variables. It uses multivariable optimization techniques to optimize the defined cost functions, which represent overall patient treatment waiting time and cost. Real-time information is provided to both patients and crewmembers. The work plan is continuously updated according to occurring events.
Owner:MAKOR ISSUES & RIGHTS

Determining Desired Job Plan Based on Previous Inquiries in a Stream Processing Framework

A data stream processing system is provided that utilizes independent sites to process user-defined inquires over dynamic, continuous streams of data. A mechanism is provided for processing these inquiries over the continuous streams of data by matching new inquiries to previously submitted inquiries. The job plans containing sets of processing elements that were created for both the new inquiry and the previous inquiries are compared for consistency in input and output formatting and commonality of processing elements used. In accordance with the comparison, the new job plan, previous job plans or a combination of the new and previous job plans are used to process the new inquiry. Based on the results of processing the new inquiry, a determination is made regarding which job plans are used for future inquiries.
Owner:IBM CORP

Method, apparatus, data structure and system for scheduling work consistent with an entity's strategic objectives

A method, apparatus, data structure and system for scheduling work consistent with and supportive of the strategic objectives of an entity is disclosed herein. In its preferred embodiment, the strategic objectives are defined and the primary strategic objective is chosen along with a measure for the primary strategic objective. Next, a measure for scheduling work is defined and chosen that is consistent with the primary strategic objective and the objective's measure. Next, the constraints to schedule work by are evaluated, the primary constraint selected and the order within the chosen constraint prioritized. The work schedule measure is then calculated for each job in the work queue for the selected constraint. All of the jobs are sorted based upon the calculated work schedule measures with the job having the largest positive impact on the work schedule measure being first. The prioritized job is then scheduled into the prioritized constraint.
Owner:STRATEGIC FORESIGHT

Model-driven assignment of work to a software factory

A computer implemented method, system, and / or computer program product assigns work to a software factory for implementing a project. A project model of a project is generated. Project model subcomponents are mapped to work packets that are available to a software factory, thus leading to the generation of a work plan for performing the project via an execution of the available work packets.
Owner:GLOBALFOUNDRIES US INC

Power supply plant performance index evaluating method and system based on policy library

ActiveCN108154291AProduction Site Risk ControlFully grasp the equipment statusResourcesInformation technology support systemProgram planningWork planning
The invention relates to a power supply plant performance index evaluating method based on a policy library. The method comprising the steps that the policy library of a power supply plant is constructed according to technical supervision and countermeasure standards and the actual conditions of the power supply plant; a regular work plan, an index regular supervision plan and a real-time supervision plan are generated; the implementation of the regular work plan, the index regular supervision plan and the real-time supervision plan is supervised to acquire implementation results; the implementation results are collected, and problems are generated according to the implementation results and a preset problem generation rule; the generated problems are classified, and then a problem libraryis generated; based on the problems in the problem library, the method automatically generates a problem rectification work plan; and the policy library, the regular work plan, the index regular supervision plan, the real-time supervision plan, the implementation, the implementation results, the problem library, the problem rectification work plan and the rectification of the problems are collected to form a large database.
Owner:ZHANGJIAKOU POWER SUPPLY COMPANY OF STATE GRID JINBEI ELECTRIC POWER COMPANY +2

PDA based onsite maintenance day work planning method

ActiveCN106934484ATimely feedback on total workloadTimely feedback on total urgencyForecastingResourcesWork planningPlanning approach
The invention relates to a PDA based onsite maintenance day work planning method, belongs to a dispatching method, and aims at solving the problems that the prior art lacks an accurate dispatching algorithm, the efficiency is low and maintenance resources are wasted. The method comprises the following steps that abnormal points are combined to generate an abnormal work order; the abnormal work order is filtered according to a dispatching area; a shortest path from a maintenance point of the abnormal work order and an arrest point and a mutual shortest path are calculated; a repeated path matrix is generated; the repeated path matrix is scanned to generate an initial route list, and preliminary dispatching routes are obtained; the preliminary dispatching routes are ordered in the descending order of emergency degrees; the preliminary route of the highest emergency degree is selected, and whether points are added to or deleted from the selected preliminary route is determined; and a point adding or deleting algorithm is executed to generate a fine dispatching route, so that the workload of each dispatching route is saturated but not exceed a prescribed workload and the total emergency degree of the route is high. An accurate dispatching algorithm is realized, a maintenance staff can be directly to another place onsite needless of coming back, the efficiency is high, and waste of maintenance resources is low.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER +2

Method and Apparatus for Constraint-based Staff Scheduling

InactiveUS20110112877A1Quickly intractableIncrease the number ofResourcesHorizonWork planning
A constraint-based framework models and solves the problem of assigning staff, for example a set of cardiologists, to various work-shifts or work-assignments, for example a day shift and a night shift, for a pre-defined scheduling horizon, for example three months. A work-schedule is produced, which is defined as a list of staff-shift or staff-assignment combinations that meet the various criteria set by the staff and the healthcare facility on how the staff need to work. The staff then uses this work-schedule to perform the needed activities for the amount of time specified by the scheduling horizon. The scheduling problem is modeled with the help of constraints and variables to express the physical constraints specified by the staff on their work schedules and the needs of the healthcare facility. By embedding the scheduling model within a software program, a work-schedule is produced quickly that meets the requirements of the staff and the healthcare facility.
Owner:LIGHTNING BOLT SOLUTIONS

Monitoring schedule adherence of call center agents

An employee, such as a call center agent, is monitored for compliance with a work schedule based on their work location. The call center agent's physical location is periodically monitored by a schedule adherence system that includes a mobile device executing a mobile application. Location information associated with that agent is compared with location information when the agent is working during their scheduled shift. A significant deviation from the known location may be reported as a potential deviation from a defined work schedule for that employee. The call center agent can also be monitored prior to the beginning of a shift to determine if the agent will be arriving at work in time to begin their shift as scheduled. Substitute agents may be scheduled and notified in time to fill the position of the late agent.
Owner:NOBLE SYSTEMS CORPORATION

Three-dimensional human-work planning in hazardous environments with continuous feedback

Product Lifecycle Management systems, methods, and mediums. A method includes generating a simulation of an environment within a predefined space. The method includes identifying one or more locations and a process for a human to perform a task in the predefined space based on the simulation in response to receiving a request to plan the process. The method includes identifying a time spent at the one or more locations for the task to be performed. The method includes identifying values for exposure to one or more hazardous sources at each of the one or more locations from a file. The method includes calculating an amount of exposure to the one or more hazardous sources in the simulation based on the one or more locations, the process the time spent and the identified functions for exposure from the file. Additionally, the method includes determining whether the amount exceeds a threshold value.
Owner:SIEMENS PROD LIFECYCLE MANAGEMENT SOFTWARE INC

Automatic employee management method and apparatus

The invention provides an automatic employee management method and apparatus. The method comprises the following steps: a work goal of an employee is obtained, the work goal is broken down into a corresponding work plan, a workload actually completed by the employee at a time node is compared with a workload planned for the time node, and an evaluation result corresponding to the employee is obtained according to a comparison result; a technical problem that automatic employee management cannot be realized via technologies of the prior art is solved, the obtained work goal is automatically broken down to the corresponding work plan, the work plan of the employee can be automatically arranged, the workload actually completed by the employee at the time node is compared with the workload planned for the time node, the evaluation result corresponding to the employee is obtained according to the comparison result, and therefore the employee is automatically evaluated; no manual work is needed, manpower management cost is reduced, employee management efficiency is improved, and a high intelligentization level is reflected.
Owner:陈包容

Models for Guiding Physical Work

The subject disclosure is directed towards guiding a user through a physical work task. A model comprising, rules, constraints and equations corresponding to the task generates a work plan based upon user input data and work-related data. The model determines a subtask to perform based upon the data and the current state of the task, and outputs data (plan objects) used to generate of visualization that instructs the user as to how to perform the subtask, e.g., what other part to attach a current component to, what tool is needed, advice, risk assessment, alternatives and so forth. The model may base the current state on a scene input to the model that represents the current state of the task and / or historical data that indicates the current state of the task.
Owner:MICROSOFT TECH LICENSING LLC

Method for implementing engineering cost consultation service

The invention discloses an implementation method of engineering cost consulting service, which relates to the technical field of engineering construction. The method comprises the following steps: accepting the entrustment of a customer, communicating with the customer and understanding the research engineering situation; preparing the project cost consultation outline according to the project situation, and exchanging views with the entrusting party to reach a consensus according to the content of the consultation outline; forming the project team according to the requirements of the work outline, then starting to implement the specific work plan, forming the consulting opinion, formulating the construction cost consulting service steps, and exchanging views with the auditing unit to determine the final results; forming the consultation result report or opinion, and submitting the report or opinion to the entrusting party for filing. The problem of large engineering cost budget erroris solved, so that users can quickly change the problems encountered in the engineering cost consulting service, so that the engineering cost control more accurate and reasonable.
Owner:河北汉丰造价师事务所有限公司

Shipping work planning system, shipping work planning method, and shipping work method

InactiveCN104781170AGrasp the workload statusMaster job competitionData processing applicationsStorage devicesWork planningProgram planning
This shipping work planning system comprises: storage units (3, 2) for storing product information (31), progress information (32), transportation planning information (33), shipping planning information (34), and equipment information; a target loading time calculation unit (52) for calculating target loading times when loading is performed without waiting for cargo; a general work plan preparing unit (53) for determining, so as to meet the target loading times, work to be performed within a time period that is preset with set time period information for the equipment information and cargo handling equipment and cargo transporting equipment to be used for the work; a detailed work plan preparing unit (54) for determining processing times for cargo handling equipment and cargo transporting equipment operations that are determined by the general work plan preparing unit (53); and a plan output unit (6) for outputting the results created with the detailed work plan preparing unit (54). By virtue of this configuration, a work plan for shipping work, by which shipping products are loaded onto a ship, can be created in a short time.
Owner:JFE STEEL CORP

System and method of optimizing building plans

A method of generating building work plans, may include: selecting an area for evaluating an urban renovation project therein; receiving, by a controller, urban renovation data from a first database; identifying, by the controller, at least one building within the selected area, that is suitable for urban renovation by comparing data related to the at least one building with the urban renovation data; receiving, by the controller, from a second database, current architectural data for the at least one building; receiving, by the controller, data related to building rights and requirements, from a third database, for the at least one building; combining, by the controller, the received data related to building rights and requirements, architectural data and urban renovation data; and generating at least one work plan from the combined data.
Owner:TAMA FIX LTD

Integration of computerized project planning and project diagramming

A computer implemented system and method for integrating project architecture diagramming with project planning is disclosed. A project template is stored in a database, the project template comprising at least two component tasks. The project template is associated with an architecture entity identifier. A project architecture diagram is received comprising at least one diagram entity, each diagram entity being associated with at least one diagram entity identifier. The diagram entity identifier is compared to the architecture entity identifier to identify the project template as the project template associated with the diagram entity. A project component is generated from the identified project template, the project component corresponding to the diagram entity and populated with the component tasks from the identified project template. A project work plan is populated with the project component.
Owner:IBM CORP

Work schedule creation based on predicted and detected temporal and event based individual risk to maintain cumulative workplace risk below a threshold

A method and system are provided. The method includes generating, by a server having a processor, temporal and event based risk predictions for each of a plurality of workers at a workplace, using a prediction window of a work shift. The method further includes creating, by the server having the processor, a work schedule for the plurality of workers that is optimized to maintain a cumulative workplace risk below a given threshold, based on the temporal and event based risk predictions.
Owner:IBM CORP

Cleaning vehicle system based on big data

The invention discloses a cleaning vehicle system based on big data. The system comprises a cloud server, a mobile terminal and cleaning vehicles. The mobile terminal is in communication connection with the cloud server through a wireless network. Each cleaning vehicle comprises an image collection module, an image processing module, a pressure sensor, a communication module, a PWM control circuit, a motor and an MCU. The image collection module is connected with the image processing module. The image processing module, the pressure sensor, the communication module and the PWM control circuitare connected with the MCU. The motor is connected with the PWM control circuit. The MCU is connected with the cloud server through the communication module. According to the system, working plans such as working routes, working time and the vehicle number of the cleaning vehicles can be reasonably planned and moreover, working states of the cleaning vehicles can be smartly adjusted according to road surface rubbish information, energy is effectively saved, and the service life of the vehicles is prolonged.
Owner:四川安创云通能源技术服务有限公司

Process for Streamlining Job Plans, Tasks and Ancillary Components for a Work Management System

A process for streamlining job plans for a work management system using parameterized templates is presented. The parameterization of job tasks and any ancillary components allows job plans to be consolidated into job plan templates. Various job plan instances can then be configured using such a template, representing the various configurations of a class of asset. The advantage of this approach is reducing the volume of material that must be maintained for potentially mission critical, safety critical job plans. Furthermore, it allows for the generation of fine-grain job plans for the various subclasses of an asset. Ultimately, it enables an organization to shift focus towards developing the best possible job tasks, which are then reused to develop the best possible job plans.
Owner:BABB DERRICK TOBIAS

Method for task association of mobile terminal and background management system

The invention relates to a method for task association of a mobile terminal and a background management system. The method includes the following steps that S1, the mobile terminal receives a working instruction sent by the background management system, the working instruction is generated after the background management system receives inside and outside working task requests or a set working plan, and the working instruction is associated with a folder generated by the background management system; S2, the mobile terminal automatically generates a file package associated with the working instruction similarly; S3, after the mobile terminal generates information needing to be uploaded to the background management system, the information to be uploaded is packaged together and automatically stored in the file package and then is uploaded. The purpose that the folder generated by the user background management system and the file package of acquired data in the working process of a mobile terminal user are associated and combined is achieved, and therefore the working efficiency of the mobile terminal user is greatly improved, and meanwhile convenience is brought to management of the background management system for related data.
Owner:SHENZHEN BITE NEW TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products