The invention relates to the technical field of part
assembly line flexible reconstruction, and discloses a part
assembly line flexible
reconstruction method aiming at capacity flexible matching, which comprises the following steps: inputting a product
assembly process,
station characteristics, material size, weight, carrying equipment and worker skills into a process
station optimization strategy model, and carrying out
layout on modular stations; inputting the original production plan, the order information and the real-time production data into a schedule change strategy model to obtain an updated
production schedule; inputting skills, experiences and availability of workers, complexity of each process, required skill levels, production plans and target yield into a personnel allocation strategy model to obtain personnel allocation schemes of each
station, working plans of the workers and shift arrangements; based on a task-driven cooperative control mechanism, dynamically allocating current available resources, and optimizing and adjusting a production process and a task scheduling plan; according to the invention, rapid productivity adjustment of the
assembly line under different seasonal requirements is realized.