Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Jacking pipe close in butt joint and with escape pipes

A technology of escape pipe and pipe jacking, which is applied in the direction of pipes/pipe joints/fittings, pipe laying and maintenance, mechanical equipment, etc. It can solve the problems of pipe jacking without escape pipes, etc., and achieve good sealing, fast connection, and convenience crawling effect

Inactive Publication Date: 2017-08-04
成都市德容建筑劳务有限公司
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a jacking pipe that is closely connected and has an escape pipe, so as to solve the problems that the existing jacking pipe does not have an escape pipe and how to quickly butt the jacking pipe and the escape pipe

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Jacking pipe close in butt joint and with escape pipes
  • Jacking pipe close in butt joint and with escape pipes
  • Jacking pipe close in butt joint and with escape pipes

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0020] A jacking pipe that is tightly butted and has an escape pipe, which is formed by connecting more than two jacking pipes, and two or more protruding teeth 9 arranged at intervals are respectively arranged on the two ends of the jacking pipe, connecting two The jacking pipes are meshed and docked by convex teeth 9. An escape pipe 1 is installed on the inner pipe wall of the jacking pipe. The two ends of the escape pipe 1 are provided with corrugated joints 2. The corrugated joints 2 of the adjacent escape pipe 1 pass through the connecting ring 3. interconnected.

[0021] During on-site construction, it is necessary to dock the pipe jacking of the latter section with the pipe jacking of the previous section, install the escape pipe 1 on the inner pipe wall of the pipe jacking, and the two sections of pipe jacking can quickly complete the docking through the convex teeth 9, and Due to the position limitation of the protruding teeth 9, the escape pipe 1 can also be docked q...

Embodiment 2

[0023] A jacking pipe that is tightly butted and has an escape pipe, which is formed by connecting more than two jacking pipes, and two or more protruding teeth 9 arranged at intervals are respectively arranged on the two ends of the jacking pipe, connecting two The jacking pipes are meshed and docked by convex teeth 9. An escape pipe 1 is installed on the inner pipe wall of the jacking pipe. The two ends of the escape pipe 1 are provided with corrugated joints 2. The corrugated joints 2 of the adjacent escape pipe 1 pass through the connecting ring 3. interconnected. The two ends of the connecting ring 3 are respectively provided with annular grooves 4 , the end surfaces of the corrugated joints 2 are inserted into the annular grooves 4 , and the corrugated joints 2 and the connecting ring 3 are respectively provided with mutually matching connecting fasteners. The end face of the corrugated joint 2 is inserted into the annular groove 4, and then reinforced with connecting fa...

Embodiment 3

[0026] A jacking pipe that is tightly butted and has an escape pipe, which is formed by connecting more than two jacking pipes, and two or more protruding teeth 9 arranged at intervals are respectively arranged on the two ends of the jacking pipe, connecting two The jacking pipes are meshed and docked by convex teeth 9. An escape pipe 1 is installed on the inner pipe wall of the jacking pipe. The two ends of the escape pipe 1 are provided with corrugated joints 2. The corrugated joints 2 of the adjacent escape pipe 1 pass through the connecting ring 3. interconnected. The two ends of the connecting ring 3 are respectively provided with annular grooves 4 , the end surfaces of the corrugated joints 2 are inserted into the annular grooves 4 , and the corrugated joints 2 and the connecting ring 3 are respectively provided with mutually matching connecting fasteners. The end face of the corrugated joint 2 is inserted into the annular groove 4, and then reinforced with connecting fa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to pipe jacking, in particular to a pipe jacking which is tightly butted and has an escape pipe. A jacking pipe tightly butted with an escape pipe, which is formed by connecting more than two jacking pipes, and two or more protruding teeth (9) arranged at intervals are respectively arranged on the two ends of the jacking pipe, and are connected to each other. The two jacking pipes are meshed and docked by convex teeth (9). An escape pipe (1) is installed on the inner pipe wall of the jacking pipe. The two ends of the escape pipe (1) are provided with corrugated joints (2). The corrugated sections (2) of the pipe (1) are connected to each other by connecting rings (3). The invention installs an escape pipe inside the pipe jacking, which is convenient for people to escape from the pipe jacking, and can quickly complete the butt joint between the pipe jacking and the escape pipe (1).

Description

technical field [0001] The invention relates to pipe jacking, in particular to a pipe jacking which is tightly butted and has an escape pipe. Background technique [0002] Pipe jacking construction is a non-excavation construction method, and it is a pipeline burying construction technology that does not excavate or excavates less. Pipe jacking construction is to use the jacking force generated by the jacking equipment in the working pit to overcome the friction between the pipeline and the surrounding soil, push the pipeline into the soil according to the designed slope, and transport the earth away. In the long-distance pipe jacking construction, workers need to enter the front end of the pipe jacking for survey and maintenance, so the safety of the workers needs to be guaranteed. During on-site construction, how to complete the quick docking of the jacking pipe and the escape pipe has become a difficult problem. Contents of the invention [0003] The object of the pre...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F16L1/036F16L1/06
CPCF16L1/036F16L1/06
Inventor 曾晓予
Owner 成都市德容建筑劳务有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products