Beam feeding hoisting method for tail part of double-width bridge
A hoisting method and beam technology, which is applied to bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as unsatisfactory water depth, extended construction period, and requirements for floating beams, so as to reduce the number of vertical holes and reduce operational risks , The effect of shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] The present invention will be further described in detail below in conjunction with the embodiments, so that those skilled in the art can implement it with reference to the description.
[0042] It should be noted that the experimental methods described in the following embodiments, unless otherwise specified, are conventional methods, and the reagents and materials, unless otherwise specified, can be obtained from commercial sources.
[0043] A method for hoisting beam feeding at the rear of a double-width bridge, comprising the following steps:
[0044] S1. Install the crane crane 2 on the bridge erecting machine. The crane crane 2 can move along the length direction of the main girder 1 of the bridge erecting machine. Wherein, the crane crane 2 includes: a horizontal beam 21, the beam 21 is located at Between the two outriggers 22, the outrigger 22 is a figure-eight outrigger, and the outrigger 22 can move along the length direction of the main girder 1 of the bridge...