Prefabricated building project construction process control system
A process control system and prefabricated technology, applied in the field of intelligent management systems, can solve the problems that the four-dimensional construction simulation analysis system cannot simulate and analyze prefabricated concrete structures.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0041] A construction process control system for a prefabricated building project, including an import module, an analysis module, a production module and an adjustment module, wherein:
[0042] The import module is used to extract the data of the BIM model and import it into the system; the BIM model is a model formed by modeling with Revit software or a CAD drawing with corresponding graphic elements.
[0043] The analysis module includes calculation rule module, space analysis module, time analysis module, process analysis module and resource analysis module;
[0044] Calculation rule module, u...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com