[0045] A multi-station mobile construction seat, see figure 1 and figure 2 , including a bearing base 110, at least two construction stations 102 carried on the bearing base 110, each of the construction stations 102 includes a mobile base 111 slidably connected to the bearing base 110; and drives the mobile base 111 The driving assembly that slides relative to the bearing base 110; the bearing base 110 is carried on the bearing foundation; it should be pointed out that the bearing foundation can be a foundation or a ground floor building, and the ground floor building mentioned here can be an underground building The object can also be a ground building that has been built, that is to say, the ground building that has been built is used as a load-bearing foundation, and a load-bearing base 110 is set on the roof of the building.
[0046] Wherein, the jacking unit 101 is arranged in the middle of the bearing base 110 along the sliding direction of the moving base 111 , and s...
Embodiment 2
[0052] An assembled jacking-type building construction method, which is completed by using the multi-station mobile construction seat in the first embodiment, see figure 1 and Figure 5 , including the following steps:
[0053] Step 1, building a load-bearing base for bearing the load-bearing base 110 and the jacking unit 101, and building the jacking unit 101 on the load-bearing base;
[0054] Step 2, building a multi-station mobile construction seat, the construction seat includes at least two construction stations 102, and the adjacent construction stations 102 can be alternately moved directly above the jacking unit 101;
[0055] Step 3, build building layers 103 on the construction stations 102 respectively, the building layers 103 include a carrier body 104 and a building body 105 arranged from bottom to top, and the carrier body 104 is provided with jacking supports for installation The connection groove 107 of the arm 106; one of the construction stations 102 carryin...