Consolidation grouting combined with double-row steel pipe pile support method for ultra-deep foundation pit with miscellaneous fill
A technology for steel pipe piles and deep foundation pits, which is used in infrastructure engineering, sheet pile walls, buildings, etc., can solve the problem of low drilling efficiency of pneumatic follow-pipe casing, difficult drilling of self-advancing bolts, and voids. It can avoid mud pollution, fast and easy sealing and grouting, and good anchoring and reinforcement.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] The method of consolidation grouting combined with double-row steel pipe pile support provided in this example includes the following steps:
[0051] (1) Construction of steel pipe piles and grouting retaining structures
[0052] 1. Construction process of steel pipe piles
[0053] Positioning → Drilling machine in place → Drilling → Fabrication and installation of steel pipe piles → Sealing around the steel pipe → Grouting bag sealing pressure grouting.
[0054] 2. The construction process of flower tube grouting
[0055] Positioning → drill in place → drilling → installation of flower tubes → sealing holes around flower tubes → pressure grouting of flower tubes.
[0056] 3. Construction process of crown and beam
[0057] Chiseling pile head → steel bar binding → support formwork → pouring concrete → formwork removal → maintenance.
[0058] 4. Operation points
[0059] 1) Steel pipe material and processing: Steel pipe piles are made of Ф146*5 steel pipes, flower p...
Embodiment 2
[0078] Embodiment 2 application example
[0079] (1) Foundation Pit Support Project of Eastern Hospital of Affiliated Hospital of Qinghai Hospital
[0080] 1.1 Project overview
[0081] The project is located in Laoshan District, Qingdao City, with 4 to 16 floors above ground and 3 floors underground, with an absolute base elevation of 12.45 to 15.45m. The total length of the foundation pit is about 590m, and the excavation depth is 10-16m. On the north side of the foundation pit are the existing outpatient and ward buildings. The multi-storey building adjacent to the foundation pit adopts an independent foundation, with the strongly weathered granite zone as the bearing layer, and the excavation line is only 700mm away from the nearest point of the building. The indoor elevation of the building is 31.95m, and the elevation of the independent foundation base is 23.5-25.5m, that is, the thickness of the miscellaneous fill below the indoor flat is 6.45-8.45m, and below the ind...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology