Method for constructing underground continuous wall in base rock
A technology for underground diaphragm walls and bedrock, which is applied in foundation structure engineering, sheet pile walls, earth movers/shovels, etc. It can solve the problem of bucket teeth being inserted into it, hydraulic grabs cannot complete hole construction, and cannot complete closure Grab the soil and other problems to achieve smooth construction, improve construction efficiency, and improve the effect of bearing capacity
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2015-06-10
Abstract
Description
technical field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a method suitable for constructing an underground continuous wall in bedrock of a hard stratum. Background technique
[0002] At present, hydraulic grabs are used for hole-forming construction in the construction of underground diaphragm walls. When the hydraulic grabs are lowered during construction, the grabs are inserted into the soil by their own gravity, and then closed to grab the soil. When the bottom is rocky, the grab cannot insert the bucket teeth into it by its own weight, and it cannot complete the action of closing and grabbing the soil. Therefore, in the hard formation, the hydraulic grab cannot complete the hole-forming construction. Contents of the invention
[0003] In view of the above-mentioned problems in the prior art, the object of the present invention is to provide a method for constructing an underground continuous wall in ...
Examples
Embodiment Construction
[0027] The present invention is further described below, but protection scope of the present invention is not limited thereto:
[0028] A method for constructing an underground diaphragm wall in the bedrock of the present invention is to excavate a guide wall trench of a certain length along the periphery of the underground structure or high-rise building foundation pit designed on the drawing on the ground, and then arrange a single-layer steel mesh Concrete is poured in pieces to form a guide wall, and then a groove section of a certain width is excavated in the guide wall with a combined grooving machine in the state of mud retaining wall, and then the steel cage is hoisted into the groove section, and the reaction box is placed on both sides of the steel cage. On the side, concrete is poured in the groove section filled with mud by the conduit method, and the concrete is gradually poured upward from the bottom of the groove section ditch, and at the same time, the mud is re...