The invention discloses an upper half middle wall
rapid construction method suitable for an extra-large section tunnel, and belongs to the technical field of
tunnel construction.The method comprises the steps that firstly, a tunnel face is divided into an upper step, a middle step and a lower step, then the upper step, the middle step and the lower step are each divided into a left working face and a right working face, and the edge positions of the left working face and the right working face of the middle step are marked; the construction position of a wall face supporting
pipe is determined; after the left
pilot tunnel of the upper step is excavated to the preset length, a left end face groove is excavated in the end position, the shape of the left end face groove is consistent with that of the left working face of the middle step, the permanent support side of the excavated part is supported in time after excavation, and temporary vertical supports are constructed; according to the method, after construction of the left
pilot tunnel and the right
pilot tunnel of the upper step is finished, the
left wall face supporting
pipe and the right wall face supporting
pipe are constructed correspondingly and can be used for supporting the edge position of the middle step, and when pilot tunnels on the two sides of the middle step are constructed, the stability of the pilot
tunnel wall face of the middle step can be improved, and tunnel deformation and other problems caused by collapse can be prevented.