Concrete vibrating equipment for rural ditch construction
A technology for concrete and ditches, which is applied in the field of concrete vibrating equipment for rural ditches construction, and can solve problems such as easy collapse affecting water, voids, and easy voids in concrete
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] Concrete vibrating equipment for rural ditch construction, such as Figure 1-4 As shown, it includes base plate 1, wheel 2, pole 3, guide rod 4, casing 5, fastening bolt 6, frame 7, horizontal plate 8, slide rail 9, slider 10, insertion rod 11, first guide Cover 12, first motor 13, cam 14, connecting rod 15, vertical bar 16, movable plate 17, roller 19 and top plate 20, bottom plate 1 is equipped with wheels 2 on the left and right sides, bottom plate 1 top is symmetrical A pole 3 is installed, and a top plate 20 is installed between the upper parts of the left and right sides of the pole 3. A guide rod 4 is installed on the left and right sides of the front side of the top plate 20. The guide rod 4 is covered with a sleeve 5, and the left sleeve 5 Fastening bolts 6 are provided in the left middle part and the right middle part of the right casing 5, and a frame 7 is installed between the bottom ends of the casing 5 on the left and right sides. The first guide sleeves ...
Embodiment 2
[0023] Concrete vibrating equipment for rural ditch construction, such as Figure 1-4As shown, it includes base plate 1, wheel 2, pole 3, guide rod 4, casing 5, fastening bolt 6, frame 7, horizontal plate 8, slide rail 9, slider 10, insertion rod 11, first guide Cover 12, first motor 13, cam 14, connecting rod 15, vertical bar 16, movable plate 17, roller 19 and top plate 20, bottom plate 1 is equipped with wheels 2 on the left and right sides, bottom plate 1 top is symmetrical A pole 3 is installed, and a top plate 20 is installed between the upper parts of the left and right sides of the pole 3. A guide rod 4 is installed on the left and right sides of the front side of the top plate 20. The guide rod 4 is covered with a sleeve 5, and the left sleeve 5 Fastening bolts 6 are provided in the left middle part and the right middle part of the right casing 5, and a frame 7 is installed between the bottom ends of the casing 5 on the left and right sides. The first guide sleeves 1...
Embodiment 3
[0026] Concrete vibrating equipment for rural ditch construction, such as Figure 1-4 As shown, it includes base plate 1, wheel 2, pole 3, guide rod 4, casing 5, fastening bolt 6, frame 7, horizontal plate 8, slide rail 9, slider 10, insertion rod 11, first guide Cover 12, first motor 13, cam 14, connecting rod 15, vertical bar 16, movable plate 17, roller 19 and top plate 20, bottom plate 1 is equipped with wheels 2 on the left and right sides, bottom plate 1 top is symmetrical A pole 3 is installed, and a top plate 20 is installed between the upper parts of the left and right sides of the pole 3. A guide rod 4 is installed on the left and right sides of the front side of the top plate 20. The guide rod 4 is covered with a sleeve 5, and the left sleeve 5 Fastening bolts 6 are provided in the left middle part and the right middle part of the right casing 5, and a frame 7 is installed between the bottom ends of the casing 5 on the left and right sides. The first guide sleeves ...