Construction worker intelligent management system fusing RFID of BIM

An intelligent management system and technology for construction workers, applied in the field of construction worker management, can solve problems such as low management efficiency of construction workers, and achieve the effects of improving personnel utilization efficiency, rational allocation, and simple and efficient worker information management

Pending Publication Date: 2018-09-28
EAST CHINA UNIV OF TECH
View PDF5 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] An embodiment of the present invention provides an intelligent management system for construction workers integrated with BIM RFID to solve the problem of low management efficiency of construction workers in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction worker intelligent management system fusing RFID of BIM
  • Construction worker intelligent management system fusing RFID of BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0038] see Figure 1~2 The embodiment of the present invention provides an intelligent management system for construction workers integrated with BIM RFID, including: a server 1, an intelligent terminal 2, a safety helmet 3 and an area terminal 4, and the server 1 and the intelligent terminal 2 are embedded with information management The platform 5 and the server 1 are also embedded with a BIM supervision platform 6 . It should be noted that the server 1 is ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction worker intelligent management system fusing RFID of a BIM. The system comprises a server, an intelligent terminal, a helmet and a regional terminal, wherein information management platforms are embedded in the server and the intelligent terminal respectively, and a BIM supervision platform is also embedded in the server. According to the system, by embeddingthe information management platforms into the server in a monitoring room and an intelligent mobile phone of a worker (that is, an information management APP is downloaded), the worker performs enrollment on the corresponding information management platform and performs advanced work report on a visual report interface by himself/herself, therefore, worker information management is simple and efficient, the problem that building construction progress is influenced due to high worker mobility is avoided, manpower resources are reasonably allocated, and personnel utilization efficiency is improved; and attendance of the worker is checked through statistical analysis of the work type, work days and the number of reports without work of the worker, then salary is obtained through summarization, and therefore the difficulty brought to the building construction progress by the worker mobility is limited to some extent.

Description

technical field [0001] The invention relates to the technical field of construction worker management, and more particularly to an intelligent management system for construction workers integrated with BIM and RFID. Background technique [0002] Construction safety production management refers to a series of management activities such as planning, organizing, commanding and supervising the safety work in the construction production process by the construction administrative department, construction safety supervision and management agency, construction enterprises and relevant units. And no matter which management link has omissions, it may lead to safety production accidents. Work safety accidents often occur at construction sites of construction companies. In order to reduce potential safety hazards at construction sites, personnel management is extremely important. [0003] At present, the management of construction workers mainly relies on the supervision and investigat...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06K17/00
CPCG06K17/0029G06Q10/06G06Q10/105
Inventor 王振华顾连胜胡明华汤蒂莲袁志华鲁圣鹏
Owner EAST CHINA UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products