Large diameter bedding drill hole drainage goaf along roof and upper corner gas technology
A technology of layered drilling and large diameter, which is applied in the field of mining goaf and upper corner gas technology with large-diameter layered drilling along the roof. problems, to achieve the effect of eliminating gas over-limit, saving coal mining costs, and not easy to collapse holes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0015] For a first example, see figure 1 , figure 2 , image 3 , a process of drilling goaf 8 along the top and bedding along the top and the upper corner of the gas. In the drilling field, drill holes 6 with a long distance of 100-200 meters and a large diameter of 500-1000 mm forward and backward respectively along the recovery direction. After exiting the drilling tool, the processed 1-2 meter long The retaining wall casing 15 is pushed into the large-diameter borehole 6, and the large-diameter borehole 6 is sealed. ② Connect the retaining wall casing 15 with sieve holes and the corresponding extraction pipeline in the road or up the mountain. The goaf and the upper corner 10 gas are extracted.
[0016] It effectively replaces the fan-shaped arrangement of drill holes in the roof 4 to drain the gas in the goaf.
no. 2 example
[0017] For a second embodiment, see figure 1 , figure 2 , image 3 , a process of drilling goaf 8 along the top and bedding along the top and the upper corner of the gas. In the drilling field, drill holes 6 with a long distance of 100-200 meters and a large diameter of 500-1000 mm forward and backward respectively along the recovery direction. After exiting the drilling tool, the processed 1-2 meter long The retaining wall casing 15 is pushed into the large-diameter borehole 6, and the large-diameter borehole 6 is sealed. ② Connect the retaining wall casing 15 with sieve holes and the corresponding extraction pipeline in the road or up the mountain. The goaf and the upper corner 10 gas are extracted.
[0018] Wherein: 3. when large-length and large-diameter boreholes 6 are needed, construct a coal seam high-level drilling site 5 at intervals of 200-400 meters from the return airway 7, and in all coal seam high-level drilling sites 5, repeat step 1. A small drill site 16 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com