Unlock instant, AI-driven research and patent intelligence for your innovation.

Horizontal and vertical index management and control system for power grid project management, and construction method thereof

A technology of project management and index control, which is applied in the horizontal and vertical index control system of power grid project management and its construction field, can solve the problems of increasing capital investment, affecting assets, and few typical methods and cases of international advanced asset management. The effect of comprehensive cost balance

Inactive Publication Date: 2018-11-20
STATE GRID ENERGY RES INST +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] When my country's power grid is in the development period, it is necessary to increase capital investment appropriately, and this will inevitably affect the short-term economic benefits of assets, but it is beneficial to economic benefits in the long run. If we only evaluate from the current short-term economic benefit indicators, it will affect The development of power grid leads to the wrong direction, which restricts the overall long-term development of enterprises
In addition, according to the available information, there is no research on the construction of an evaluation index system and comprehensive evaluation methods specifically aimed at the effectiveness of asset management at home and abroad, and no international benchmarking work specifically aimed at the effectiveness of asset management. The country has mastered the typical methods of international advanced asset management and the case is less

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Horizontal and vertical index management and control system for power grid project management, and construction method thereof
  • Horizontal and vertical index management and control system for power grid project management, and construction method thereof
  • Horizontal and vertical index management and control system for power grid project management, and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The following will clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only some of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of this application.

[0040] The present invention will be described in detail below by way of examples.

[0041] A horizontal and vertical index control system for power grid project management proposed by the present invention includes a vertical resultant control index system and a horizontal whole-process control index system. At the project strategy level and management level, the vertical resultant control index system It consists of three strategic objectives of safety, efficiency and cycle cost. At the execution level, the horizontal whole-p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a horizontal and vertical index management and control system for power grid project management, and a construction method thereof. The system comprises a vertical result management and control index system and a horizontal full-process management and control index system, the vertical result management and control index system is established on a project strategy layer anda management layer for security, efficiency and cycle cost, the horizontal full-process management and control index system is established on an execution layer for procedural indexes related to service process, the system is constructed according to the principle of stratified evaluation and comprehensive assessment, the indexes are decomposed from the project strategy layer and the management layer to the execution layer one by one into an overall target to a management goal and are finally decomposed to index tasks of each employee so as to form a tree-like index system, the system is usedfor evaluating the overall working efficiency of the project management and the main process operation, and the comprehensive balance and organic unification of the safety, benefit and the cycle costof the companies in each province can be prompted by the application and analysis of the index system.

Description

technical field [0001] The invention belongs to the field of power grid management, and relates to a horizontal and vertical index management and control system for power grid project management and a construction method thereof. Background technique [0002] In recent years, the scale of my country's power grid and the number of equipment are increasing, the net assets of the power grid are huge, the construction of the power grid is accelerating, and the degree of rejuvenation of power grid assets is relatively high. The traditional extensive power asset management model has shortcomings in some aspects [0003] Since 2004, the State Grid Corporation of China has been exploring asset life cycle management, introduced the LCC method and LCC management, and experienced from project management to key business management, and then to asset life cycle management system, "from point to line to surface" In 2013, it began to build an asset management system with reference to the P...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q10/06G06Q50/06
CPCG06Q10/06393G06Q10/103G06Q50/06Y04S10/50
Inventor 闫湖黄碧斌张红宪洪博文胡静冯凯辉肖婉婷武骁徐晶
Owner STATE GRID ENERGY RES INST