A tower crane and its cable connection method
A cable and tower crane technology, which is applied in the field of hoisting devices, can solve the problems of affecting the service life of cables and low stability of tower cranes, and achieve the effects of easy operation, meeting height requirements, and strong support effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] a tower crane, see figure 1 , including the main support arm 1, the main support arm 1 is set vertically as a whole, the lower end of the main support arm 1 is supported on the ground, the upper end of the main support arm 1 is provided with a cab 5, and one side of the cab 5 is connected to the boom 6 , The boom 6 is provided with a suspension head 8, the suspension head 8 can be used to lift heavy objects, and the other side of the cab 5 is connected with a balance arm 7.
[0052] A control device 9 is arranged in the driver's cab 5 , and the control device 9 is connected to the cable 2 .
[0053] see figure 2 as well as image 3 , the main support arm 1 includes at least three vertical struts 4 in a vertical arrangement, in this embodiment, the number of vertical struts 4 is four, and a reinforcing rod 10 is connected between two adjacent vertical struts 4 . On the bar wall of each vertical strut 4, be provided with first chute 16, the lengthwise direction of fi...
Embodiment 2
[0066] A cable connection method for the tower crane in Embodiment 1, the operation steps are as follows:
[0067] Step 1: place the sliding part 11 on the ground, and arrange all the connecting rods 12 in a straight line, and the communication channels 15 in all the connecting rods 12 are parallel to each other;
[0068] Step 2: The end of the cable 2 first passes through the communication channel 15 at the end of the connecting rod 12, and then passes through the communication channel 15 in each connecting rod 12 in turn;
[0069] Step 3: Rotate all the connecting rods 12 around the first hinge point 14, and the adjacent connecting rods 12 are bent mutually to form a Z-shaped overlapping state;
[0070] Step 4: The external crane lifts the sliding part 11 in step 3 and the cable 2 inside the sliding part 11 to the cab 5 of the tower crane;
[0071] Step 5: Insert the first sliding block 13 into the first slide groove 16 in sequence.
[0072] Step 6: The second sliding bloc...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


