Anti-collapse monitoring rod device applied to mountain slope
A pole device and hillside technology, which is applied in the field of anti-collapse monitoring pole devices, can solve problems such as easy landslides, easy collapse of monitoring poles, and damage to surveillance cameras
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] Such as figure 1 As shown, a kind of anti-collapse monitoring rod device applied to the hillside includes a monitoring rod 1 and a camera 2, the top of the monitoring rod 1 is equipped with a camera 2, and the bottom of the monitoring rod 1 is provided with a positioning rod 3. The positioning rod 3 is buried in the soil, and a base is provided under the monitoring rod, and the monitoring rod 1 is fixed on the base 4 by a steel bar 6, and the base 4 is fixed in the soil by a steel nail 10. A steel bar support rod 5 is provided on the downhill, one end of the steel bar support bar 5 is supported on the monitoring rod 1, and the other end of the steel bar support bar 5 is welded on the sleeper 7, and the sleeper 7 is fixed on the soil by steel nails 10. Among them, the function of the sleeper is to increase the contact area between the steel support rod and the ground, and prevent the support rod from sinking when the steel support rod receives the thrust of the monitorin...
Embodiment 2
[0023] Such as figure 1 As shown, the difference between this embodiment and Embodiment 1 is that the monitoring rod 1 is a cylinder that uniformly becomes smaller from bottom to top, the material of the monitoring rod 1 is a polyurethane composite material, and the ground anchor 9 is vertical to the horizontal plane. Buried 2M underground. The included angle between the steel wire rope 8B and the horizontal plane is 25°, and the sleeper 7 is made of concrete material. The purpose of setting the monitoring rod as a cylindrical structure with a small top and a large bottom is to lower the center of the monitoring rod and increase the stability of the monitoring stem. Since the vertical horizontal plane is buried in the soil when the ground is anchored, the included angle should not be greater than 30° at this time. °, the smaller the included angle, the smaller the longitudinal component of the pulling force, and the smaller the pull-out force of the ground anchor, which ensur...