[0035] The construction method of the mud-water splitting crack extension model in the clay stratum among the present invention comprises the following steps:
[0036] S1, such as figure 1 Shown, form the uniform clay layer that thickness is 16-22m (preferably 18m) with clay accumulation;
[0037] S2, such as figure 1 Shown, in described clay layer, vertically burying diameter is 45-55mm (preferably 50mm) steel pipe 1, and the muddy water pressure pipe 2 that length is 15-30cm (preferably 20cm) is connected at the bottom of described steel pipe 1 , and offer at least one pressurization hole 21 on the outer peripheral surface of described muddy water pressurization pipe 2; Above described clay layer, be provided with for storing pressurized liquid (the described pressurized liquid is the mixture of bentonite and water, by weight ratio Calculate, the massfraction of described bentonite is 10%-20%) muddy water tank 3 and pressurization device 4, and make described muddy water t...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
| Diameter | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |