Device for pile head construction and its construction method
A construction method and pile head technology, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of pile head interception difficulty, speed up the construction speed of pile foundation engineering, etc., so as to reduce waste, speed up construction speed, and solve interception problems. difficult effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0046] see figure 1 The invention provides a device for pile head construction. By first grouting the grouting pipe into the steel cage to a specified height, and then hoisting the protective cylinder into the steel cage, the grouting is continued, and the rotation direction of the door panel is restricted by the direction-limiting structure. , so that the grouting pipe can pass through the casing and push the door plate for grouting, and the grout will not push the door plate and flow into the casing. The construction of the broken pile head solves the problem of difficult interception of the pile head, and at the same time accelerates the construction speed of the pile foundation project and reduces the waste of construction materials. The device for pile head construction of the present invention will be described below with reference to the ...