A steel pile and state technology, which is applied in ship accessories, ship parts, ship construction, etc., can solve the problems of long construction period of ship loading, high shipping cost, low shipping efficiency, etc., to improve efficiency and solve ship loading problems. The effect of longer construction period and saving shipping cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] Such as Figure 1 to Figure 5 Shown, the present invention adopts following steps:
[0033] first step, such as Figure 3-1 As shown, several concrete pads 5 are placed on land, and storage buttresses 4 are placed on several concrete pads 5;
[0034] The second step, such as Figure 3-2 As shown, several bottom beams 6 and several bottom columns 7 are placed on the storage pier 4;
[0035] The third step, such as Figure 3-3 As shown, the steel pile 1 is suspended on several bottom beams 6, and the placement of the bottom steel pile 1 is completed;
[0036] The fourth step, such as Figure 3-4 As shown, several middle-level beams 8 and several middle-level columns 9 are installed on several bottom-level columns 7 by means of bolt connection;
[0037] The fifth step, such as Figure 3-5 As shown, the steel pile 1 is hung on the middle beam 8 by a crane, and then the upper steel pile 1 is placed;
[0038] The sixth step, such as Figure 3-6 As shown, several uppe...