Support counter-force control device and method for multi-leg support system
A control device and support system technology, applied in the erection/assembly of bridges, bridges, buildings, etc., can solve problems such as inaccurate reaction force, and achieve the effects of balanced reaction force, simple system, and fast adjustment of outrigger reaction force
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Combine below Figure 1 to Figure 3 , detailing the structural composition of the support reaction force control device for the multi-leg support system of the present invention. The main problem to be solved in this embodiment is how to accurately control the reaction force of the front outrigger when the bridge erecting machine 10 is in an unloaded state.
[0038] A support reaction force control device for a multi-leg support system. A cantilever assembled bridge erecting machine 10 is erected on the support system. The cantilever assembled bridge erecting machine 10 includes front legs 11, middle legs 12 and rear legs arranged in sequence. Legs 13, wherein the middle support leg 12 is positioned on the top of the pier 30 of the bridge assembly section 20, the rear support leg 13 is placed on the top of the pier 30 of the other bridge splicing section 20, the front support leg 11 and the middle support leg 12 Located on the same section of the bridge splicing sectio...
Embodiment 2
[0044] Please continue to refer Figure 1 to Figure 3 , the present embodiment provides a support reaction force control method of a multi-leg support system, the control method comprising the following steps:
[0045] Step 1. Provide a backup reaction force control device for the multi-leg support system. The cantilever assembly bridge erecting machine 10 is erected on the support system. The cantilever assembly bridge erecting machine 10 includes front outriggers 11 and middle outriggers 12 arranged in sequence. And rear outrigger 13, wherein, middle outrigger 12 is positioned at bridge pier 30 tops of bridge assembly section 20, rear outrigger 13 is placed on the top of pier 30 of another span bridge splicing section 20, front outrigger 11 and middle Outrigger 12 is located on the same section of bridge splicing section 20, and front outrigger 11 is arranged on the cantilever of bridge assembly section 20, and four supports 40 are arranged under front outrigger 11, and supp...