Applied testing methods and systems
A technology for application testing and application execution, applied in the field of communication, can solve problems such as limited application scenarios and inability to guarantee test coverage, and achieve the effect of high test coverage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0112] On the basis of the above application testing system, an application testing method is provided. Such as figure 2 As shown, the first embodiment of the application testing method is introduced, including the following steps:
[0113] Step S101: The background device builds and sends the application identification set of the internal call of the first entry application, the application identification set of the internal call of the application before the change, the application identification set of the internal call of the second entry application, and the internal call of the application after the change set of application identities.
[0114] Based on the structure of the device 100 before the change, the user can set the application ID set for the device 100 before the change in the background device 300 to make internal calls, and send it to the device 100 before the change, so that the device before the change can use the application ID in the subsequent process. ...
Embodiment 2
[0176] Embodiment 2 On the basis of Embodiment 1, in step S102, step S1022 is added in step S1022 to record the progress parameter indicating the progress of the internal call during the internal call process; before step S104, add the post-change device to verify the internal call of the pre-change device 100 Whether the execution is complete.
[0177] Since the execution process of the first entry application in the pre-change device 100 is not synchronous with the pre-change application, in order to ensure that the pre-change device completely executes the internal calls, the post-change device will verify whether the internal calls of the pre-change device 100 have been executed , in case the device has not completed the execution before the change and enters the test process, causing the test to fail.
[0178] The following describes the implementation process of step S1022 recording the progress parameter indicating the progress of the internal call during the internal c...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


