Large 7-shaped truss structure turn-over lifting method
A technology of truss structure and hoisting method, which is applied in building construction, construction, and building material processing, etc., can solve the problems of large deformation of the 7-shaped truss structure, low hoisting efficiency, and many ground assembly sections, and can reduce 7 The effect of the ground assembly section of the truss structure, improving the hoisting efficiency and reducing the installation measures
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The present invention will be further described below with reference to the accompanying drawings and embodiments, and the mode of the present invention includes but not limited to the following embodiments.
[0028] Such as Figure 1-4 As shown, a method for turning over and hoisting a large-scale 7-shaped truss structure provided by the present invention includes the following steps:
[0029] Step 1, lifting and turning over the 7-shaped truss structure 1, using three cranes to turn over, among the three cranes, one is the main crane 7, and the other two are respectively the first auxiliary crane and the second auxiliary crane;
[0030] First of all, four hanging points are set in the middle of the upper edge of the 7-shaped truss structure 1. Among the four hanging points, one of the hanging points is connected to a fixed hanging rope 21, and the remaining three hanging points are connected to a hand-drawn rope respectively. hoist 22, the free ends of the fixed slin...