Construction method for connecting bearing platform with pile foundation through connecting device
A technology of connecting device and construction method, applied in infrastructure engineering, construction and other directions, can solve the problems of reducing construction time, difficult docking of reserved holes between piles and caps, position deviation, etc., so as to reduce construction time and avoid damage to underground pipelines. system effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Embodiment 1, a kind of construction method that carries out cap and pile foundation connection by connecting device, comprises the following steps:
[0025] S1. Excavate the foundation pit by mechanical construction. The depth of the foundation pit depends on the height of the cap. The depth of the foundation pit is equal to the height of the cap. The surface of the cushion layer of the pit is laid with a steel plate frame prefabricated according to the length and width of the cap, and the steel pipes connected to the cap are welded at the four corners of the steel frame;
[0026] S2, using the static pressure method to insert and drive prefabricated piles. The prefabricated piles are steel pipe piles and small-diameter piles. When inserting and driving steel pipe piles, the insertion and driving of piles is determined according to the situation of the previous address exploration, the distribution position of the pipeline and the load of the overpass. For the position...
Embodiment 2
[0030] Embodiment 2, a kind of construction method that carries out cap and pile foundation connection by connecting device, comprises the following steps:
[0031] S1. Excavate the foundation pit by mechanical construction. The depth of the foundation pit depends on the height of the cap. The depth of the foundation pit is smaller than the height of the cap. The surface of the cushion layer of the pit is laid with a steel plate frame prefabricated according to the length and width of the cap, and the steel pipes connected to the cap are welded at the four corners of the steel frame;
[0032] S2, using the vibration method to insert and drive prefabricated piles. The prefabricated piles are steel pipe piles and small-diameter piles. The location of the prefabricated steel pipe piles is driven into the ground by machinery, and the prefabricated piles reserve a certain length of 800mm on the ground;
[0033] S3. After placing the prefabricated steel plate outer frame welded wit...