Big data identification method of low-voltage distribution box user phase based on load mutation synchronization
A low-voltage distribution box and load mutation technology, applied in the electric power field, can solve problems affecting users' daily life, waste of manpower and material resources, etc., and achieve the effect of improving the service level of power supply
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] A large data identification method for low-voltage distribution box user phases based on load mutation synchronization, such as Figure 4 As shown, the specific steps are as follows:
[0052] S1: The power consumption information collector periodically samples and saves the three-phase current values; the cycle is 1 second;
[0053] S2: During the operation of the power consumption information collector, if the communication message of "synchronous inspection of current mutation" uploaded by the single-phase electric energy meter is received, the three-phase current change values are calculated respectively;
[0054] S3: Analyze the three-phase current change values of phase A, phase B and phase C to obtain phase information of the single-phase electric energy meter.
Embodiment 2
[0056] On the basis of Embodiment 1, the method of uploading the "synchronous inspection of current mutation" communication message by the single-phase electric energy meter is as follows: Figure 5 As shown, that is, the working process of the single-phase electric energy meter, the specific steps are as follows:
[0057] 21) After the single-phase electric energy meter AdrX is powered on and running, the single-phase current value is periodically sampled and saved; the cycle is 1 second;
[0058]22) Calculate the current change value Iscd and the current change percentage Iscp, and judge whether the current change value Iscd and the current change percentage Iscp meet the preset conditions. "Communication message.
[0059] As a preferred embodiment, the method for calculating the current change value Iscd and the current change percentage Iscp is as follows:
[0060] Current change value Iscd=|Icur–Ipre|;
[0061] Current change percentage Iscp=(Iscd / Ipre)*100%;
[0062]...