Embodiment 1
[0022] An anti-collapse safety protection method for foundation pit fixed-point blasting, the method comprising the following steps:
[0023] A. Select the blasting point, and clean the surface of the blasting point and the surrounding ground;
[0024] B. Use drilling tools to drill holes at the blasting point;
[0025] C. Drill a hole outside the blasting point, and fix the anchor rod in the hole by grouting;
[0026] D. Squeeze the I-beam into the soil outside the hole through the bucket of the excavator;
[0027] E. Bury the explosives in the blast hole, and cover the top of the blast point with a rubber protective plate;
[0028] F. Wrap the barbed wire around the outside of the I-beam and the anchor, and cover the barbed wire on the top of the I-beam and the anchor;
[0029] G. After the foundation pit is blasted, install settlement observation devices and warning devices around it.
[0030] This method can effectively improve the protection effect of the foundation p...
Embodiment 2
[0038] An anti-collapse safety protection method for foundation pit fixed-point blasting, the method comprising the following steps:
[0039] A. Select the blasting point, and clean the surface of the blasting point and the surrounding ground;
[0040] B. Use drilling tools to drill holes at the blasting point;
[0041] C. Drill a hole outside the blasting point, and fix the anchor rod in the hole by grouting;
[0042] D. Squeeze the I-beam into the soil outside the hole through the bucket of the excavator;
[0043] E. Bury the explosives in the blast hole, and cover the top of the blast point with a rubber protective plate;
[0044] F. Wrap the barbed wire around the outside of the I-beam and the anchor, and cover the barbed wire on the top of the I-beam and the anchor;
[0045] G. After the foundation pit is blasted, install settlement observation devices and warning devices around it.
[0046] This method can effectively improve the protection effect of the foundation p...
Embodiment 3
[0054] An anti-collapse safety protection method for foundation pit fixed-point blasting, the method comprising the following steps:
[0055] A. Select the blasting point, and clean the surface of the blasting point and the surrounding ground;
[0056] B. Use drilling tools to drill holes at the blasting point;
[0057] C. Drill a hole outside the blasting point, and fix the anchor rod in the hole by grouting;
[0058] D. Squeeze the I-beam into the soil outside the hole through the bucket of the excavator;
[0059] E. Bury the explosives in the blast hole, and cover the top of the blast point with a rubber protective plate;
[0060] F. Wrap the barbed wire around the outside of the I-beam and the anchor, and cover the barbed wire on the top of the I-beam and the anchor;
[0061] G. After the foundation pit is blasted, install settlement observation devices and warning devices around it.
[0062] This method can effectively improve the protection effect of the foundation p...