Integral formwork low hanging method for bridge hanging basket construction

A formwork and bridge technology is applied in the field of integral lowering of formwork used for the construction of bridge hanging baskets, which can solve the problems of inaccessibility of crane arms, dismantling, high ground height, etc., and achieves the effect of reducing cost, strong practicability, and avoiding large-scale machinery.

Active Publication Date: 2019-08-23
CHINA RAILWAY 15TH CONSTR BUREAU GRP +1
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] After the construction and pouring of the cantilever hanging basket is completed for the last closing section or the second closing section, the bottom formwork needs to be dismantled. Sometimes due to site or space constraints, cranes and other machinery cannot be used for dismantling. The height of the river or under the bridge is high from the ground, and the crane arm cannot reach it, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The technical solution of this patent will be further described in detail below in conjunction with specific embodiments.

[0017] A method for integrally hanging formwork for bridge hanging basket construction, the specific steps are as follows:

[0018] S1, measure the distance between the lifting point of the beam surface and the site under the bridge to calculate the cutting length of the steel hinge line;

[0019] S2, using the projection below the upper beam in front of the hanging basket and the main truss column, set the reserved anchor holes vertically through the beam body. There are 4 anchor holes, and the positions of the holes are symmetrical to the center line of the line and distributed near the longitudinal beam of the hanging basket;

[0020] S3, pass the steel hinge line through the lower end of the front and rear lower beams of the bottom mold, and then use the anchorage and clamp to fix the bottom end of the steel hinge line to the lower plane of the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an integral formwork low hanging method for bridge hanging basket construction. The method particularly comprises the following steps that S1, the stranded steel wire feeding length is determined; S2, reserved anchoring holes which vertically penetrate through a bridge body are set; S3, stranded steel wires are threaded to the lower end of a front lower cross beam and the lower end of a rear lower cross beam to be fixed with the front lower cross beam and the rear lower cross beam; S4, a U-shaped clamp is machined through a round steel bar; S5, the stranded steel wirespenetrate through a flat anchor center hole channel, and the U-shaped clamp is hung on a front upper cross beam and the four hanging points of a main truss stand column through hand pulling blocks; S6, suspension rods of a suspension formwork system are completely dismantled; and S7, lifting hooks of the four hand pulling blocks synchronously downwards lower the formwork till the hand pulling blocks are loosened to the maximum stroke, anchorage device clamping sheets at the bridge surface are locked to enable the stranded steel wires to be stressed, the hand pulling blocks are lifted again andthen synchronously downwards lower the formwork, and the steps are repeated till the formwork is lowered to the right position. According to the integral formwork low hanging method for bridge hanging basket construction, the formwork dismantling purpose can be achieved, using of a large machine is avoided, the cost is reduced, the practicability is high, and the method is worth popularizing.

Description

technical field [0001] The invention relates to the field of cantilever hanging basket construction, in particular to a method for integrally lowering formwork for bridge hanging basket construction. Background technique [0002] After the construction and pouring of the cantilever hanging basket is completed for the last closing section or the second closing section, the bottom formwork needs to be dismantled. Sometimes due to site or space constraints, cranes and other machinery cannot be used for dismantling. The river or under the bridge is too high from the ground, and the crane arm cannot reach it, etc. Contents of the invention [0003] The object of the present invention is to provide a method for integrally hanging formwork for bridge hanging basket construction, so as to solve the problems raised in the above-mentioned background technology. [0004] To achieve the above object, the present invention provides the following technical solutions: [0005] A method...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 汪宗露兰旭珍党艳军韩学礼王海啸李向阳李敬波郭福源马宪峰王中立任盼
Owner CHINA RAILWAY 15TH CONSTR BUREAU GRP