A kind of installation method of prestressed steel bar device of nut column
A technology of prestressed steel bars and installation methods, which is applied in the direction of buildings, building reinforcements, building components, etc., and can solve the problems of large influence of prestress, easy oxidation, and inability to adjust tension, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] Such as Figure 1~Figure 5 Among them, a method for installing a nut column prestressed steel bar device, the device includes a first clamping piece 3 and a second clamping piece 4 that cooperate with both ends of a prestressed steel bar 1, and a clamping piece located between the first clamping piece 3 and the second The installation of the embedded part 2 that cooperates with the prestressed steel bar 1 between the two clamping parts 4 includes the following steps:
[0029] Step 1, positioning the embedded part 2; fixing the outer sleeve 21 of the embedded part 2 in the mold cavity;
[0030] Step 2, filling; filling is injected between the inner casing 22 and the outer casing 21 at one end of the embedded part 2, and the other end is blocked;
[0031] Step 3, pouring, fixing the embedded part 2; pouring in two phases, pouring the two ends of the outer casing 21 in the first phase, and pouring the middle part in the second phase;
[0032] Step 4, presetting the prest...