Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Life-time monitoring and early warning method of tunnel structure at variable cross-section

A technology for tunnel structure, monitoring and early warning, applied in earth-moving drilling, mining equipment, mining equipment, etc., can solve problems such as difficult to predict in time, structural damage cannot be strengthened in time, and single monitoring and early warning.

Active Publication Date: 2021-05-11
施甸县保施高速公路投资开发有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The construction stage and operation stage of variable cross-section cross tunnels are often monitored manually. It is difficult to predict the surface settlement and development process caused by the tunnel entrance in time, resulting in the impending structural damage not being reinforced in time. Traditional monitoring and early warning often Single, unable to monitor and warn the whole life cycle of the tunnel structure systematically

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Life-time monitoring and early warning method of tunnel structure at variable cross-section
  • Life-time monitoring and early warning method of tunnel structure at variable cross-section
  • Life-time monitoring and early warning method of tunnel structure at variable cross-section

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0044] Embodiments of the present invention are described below through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific implementation modes, and various modifications or changes can be made to the details in this specification based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the diagrams provided in the following embodiments are only schematically illustrating the basic concept of the present invention, and the following embodiments and the features in the embodiments can be combined with each other in the case of no conflict.

[0045] Wherein, the accompanying drawings are for illustrative purposes only, and represent only schematic diagrams, rather than physical drawings, and should...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a whole-life monitoring and early warning method for a tunnel structure at a variable cross-section, and belongs to the field of tunnel monitoring. The system includes a sensor, a monitoring center platform, a data storage and an alarm; the sensor is connected with the monitoring center platform; the monitoring center platform is respectively connected with the data storage and the alarm; the limit value of the monitoring index is obtained by the method of numerical limit analysis; Then analyze the numerical simulation results of the cross-section of the cross-section tunnel with variable cross-section; by comparing the numerical values ​​of the obtained results, the position of the monitoring point and the layout of the monitoring point at the cross-section of the variable-section cross-section are obtained; according to the distribution law of the structure of the cross-section cross-section tunnel, the stability of the tunnel structure is drawn up. According to the evaluation standard of variable cross-section, the monitoring and control index of the variable cross-section cross tunnel structure is established.

Description

technical field [0001] The invention belongs to the field of tunnel monitoring and relates to a method for monitoring and early warning of the whole life of a tunnel structure at a variable cross-section. Background technique [0002] Variable cross-section crossing tunnels mainly adopt the planar crossing method of Y bifurcation, or the orthogonal and oblique spatially close three-dimensional crossing method. The excavation and supporting lining of variable cross-section intersection tunnels are subject to complex structural forces and large mutual influences. There are special requirements in the determination of excavation methods, reinforcement of rock and soil at intersections, and construction monitoring and measurement. Therefore, how to control the large deformation and damage of the surrounding rock of the variable cross-section crossing tunnel and ensure the safety of the tunnel construction and operation stages is very necessary for the construction of the tunnel....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21F17/18
CPCE21F17/18E21F17/185
Inventor 段军金飞张家颖李科刘波郭鸿雁邱挎琼杨锐槐
Owner 施甸县保施高速公路投资开发有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products