Long-short routing train control system and method
A train control system and a technology for train control, applied in the field of train control systems of large and small intersections, can solve problems such as low efficiency, restricted line operation capability, and long train turnaround intervals, so as to alleviate conflicts, shorten departure intervals, and improve comprehensive services. horizontal effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Such as Figure 1-2 Shown, a kind of train control system of large and small crossing roads, the train control system of described big and small crossing roads comprises detection module 1, control module 2, first running track 3, second running track 4, first turning back track 5, the first Two turn-back rails 6, some small cross-track train turn-back stations 7 and some trains, said trains include large cross-road trains and small cross-road trains, and each small cross-road train turn-back station includes first platform and second platform, wherein, Small cross-road train turn-back station 7 is the terminal station (i.e. small cross-road train terminal station or starting station) of small cross-road train, and small cross-road train turn-back station 7 is the way station of large cross-road train;
[0031] The detection module 1 is used to detect whether there is a large cross-road train entering the first platform of the target small cross-road train turn-back sta...
Embodiment 2
[0055] A train control method for large and small intersections, such as image 3 As shown, the train control method is implemented using the train control system of the large and small intersections described in Embodiment 1, specifically including:
[0056] Step 101, detecting whether there is a train on the first running track entering the first platform of the target small crossing train turn-back station, if so, then perform step 102, if not, then continue to detect;
[0057] Step 102, generating a first departure instruction;
[0058] Step 103, according to the first departure instruction, control the small crossing train on the first return track to enter the second running track;
[0059] Step 104, detect whether the small cross-road train on the first turnback track has driven out of the first turnback track, if so, then perform step 105, if not, then continue to detect;
[0060] Step 105, generating a second departure instruction and a first return instruction;
...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


