Fabricated building transition floor PCF board installation construction method

A construction method and prefabricated technology, applied in the direction of building, building components, building structure, etc., to achieve the effect of low cost, avoid rework and save construction cost

Pending Publication Date: 2019-11-15
JILIN JIANZHU UNIVERSITY
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The present invention aims at the above-mentioned deficiencies of the prior art, and provides a method for installing and constructing PCF boards at the transfer layer of an assembled building, which improves the hoisting efficiency at the transfer layer of PCF boards, ensures positioning accuracy, and solves the problem of difficult fixation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fabricated building transition floor PCF board installation construction method
  • Fabricated building transition floor PCF board installation construction method
  • Fabricated building transition floor PCF board installation construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] In order to enable those skilled in the art to better understand the technical solutions of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0036] see Figure 1 to Figure 7 shown;

[0037] The installation and construction method of the prefabricated building conversion layer PCF board of the specific embodiment of the present invention comprises the following steps:

[0038] Step S1, install a combined connector on the side of one end of the two vertical cast-in-place structures 1 that are perpendicular to each other to be connected to the PCF board 2;

[0039] Such as figure 1 As shown, this embodiment is two cast-in-place structures 1 load-bearing walls at the corner position of the prefabricated building transf...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a fabricated building transition floor PCF board installation construction method. The fabricated building transition floor PCF board installation construction method includesthe following steps that S1, the side faces of one ends, to be connected with the PCF board, of two vertical cast-in-place structures which are mutually perpendicular to each other are provided with combined connectors; S2, the PCF board is lifted so that the bottom surface of an outer blade board of the PCF board is placed on a standard bolt, and the outer face of the outer blade board is parallelly rotated into the standard bolt through adjustment to let the standard bolt lean on the outside of the outer blade board of the PCF board; S3, the posture of the PCF board is adjusted, and precisepositioning of the PCF board is completed; S4, an inner side formwork is erected along the inner side of the PCF board, and concrete slurry is poured between the PCF board and the inner side formwork;and S5, the combination connectors are removed and other conversion layer corner parts are recycled. According to the fabricated building transition floor PCF board installation construction method,the PCF board is fixed, the fixing process is simple and convenient and fast, the connectors can be recycled, lifting efficiency of the PCF board is improved, resources are saved and the cost is lowered.

Description

technical field [0001] The invention belongs to the technical field of prefabricated buildings, and in particular relates to a method for installing and constructing PCF boards on conversion floors of prefabricated buildings. Background technique [0002] In recent years, under the background that the country vigorously advocates green energy conservation, the transformation and upgrading of the construction industry has gradually accelerated, and prefabricated buildings have become more and more popular due to their standardized production, mechanized construction, standardized management, and integrated construction. Industrialization, standardization, and standardization of the construction industry, and strive to continuously increase the proportion of prefabricated buildings in the country and continue to optimize. [0003] PCF exterior wall panels (also known as prefabricated component exterior wall forms or PCF prefabricated exterior wall panels, hereinafter referred ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/14E04G21/18E04B2/86
CPCE04B2/86E04B2/8652E04B2002/867E04B2002/8676E04G21/14E04G21/1841E04G21/185
Inventor 丁晓欣常晓颖朱韬丁启明王芳王宝龙
Owner JILIN JIANZHU UNIVERSITY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products