Unlock instant, AI-driven research and patent intelligence for your innovation.

Full-life-cycle building informatization management method and device

A full-lifecycle, information-based management technology, applied in the field of full-lifecycle building information management, can solve problems such as inconvenient use, inability to integrate data and support phased application of buildings, and inability to solve other data integration and display problems

Pending Publication Date: 2019-11-22
LANZHOU JIAOTONG UNIV
View PDF1 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the BIM model pays more attention to the structured information of the building itself, and only includes the basic geometric structure data of the building, such as the length, width and height structure. At this stage, it cannot solve the integration and display of other data except structured information, involving construction The data in other stages of operation and maintenance need to be associated in order to carry out the guiding work of construction design. In the building life cycle, the data in the construction, construction, and operation and maintenance stages other than the design stage cannot be integrated and support the phased application of the building, so it cannot Provide detailed construction guidance for each stage in the building life cycle, causing inconvenience in practical applications

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Full-life-cycle building informatization management method and device
  • Full-life-cycle building informatization management method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The preferred embodiments of the present invention will be described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.

[0034] like figure 1 As shown, a full life cycle building information management method includes:

[0035] S101: Acquiring BIM components;

[0036] S102: Obtain component ID and geometric structure data information of the BIM component;

[0037] S103: Obtain digital hardcover standardized data of the BIM component;

[0038] S104: Establish a connection relationship between the geometric structure data information of the BIM component and the digital hardcover standardized data according to the component ID;

[0039] S105: Generate a full life cycle model of a building from the BIM component based on the connection relationship.

[0040] The generated building li...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a full-life-cycle building informatization management method and a full-life-cycle building informatization management device. The full-life-cycle building informatization management method comprises the steps of obtaining a BIM component; obtaining a component ID and geometric structure data information of the BIM component; acquiring digital hardcover standardized data ofthe BIM component; establishing a connection relationship between the geometric structure data information of the BIM component and the digital hardcover standardized data according to the componentID; and generating a building full-life-cycle model by the BIM component based on the connection relationship. The advantages of reducing cost and improving efficiency are achieved.

Description

technical field [0001] The present invention relates to the field of building informatization, in particular to a method and device for managing building informatization throughout the life cycle. Background technique [0002] Building Information Modeling (Building Information Modeling, BIM) is the latest information technology in the field of architectural design, construction and operation and maintenance. Through BIM technology, the data of the whole life cycle of the building can be displayed intuitively in three dimensions. However, the BIM model pays more attention to the structured information of the building itself, and only includes the basic geometric structure data of the building, such as the length, width and height structure. At this stage, it cannot solve the integration and display of other data except structured information, involving construction The data in other stages of operation and maintenance need to be associated in order to carry out the guiding w...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G06Q10/06G06Q50/08
CPCG06Q10/0631G06Q50/08
Inventor 周庆华郑云水董昱
Owner LANZHOU JIAOTONG UNIV