A construction method for foundation pit dewatering well and earthwork intersecting operation

A technology of cross operation and construction method, applied in the direction of infrastructure engineering, excavation, construction, etc., can solve the problems of increasing construction cost, construction of dewatering wells, soil moisture, etc., to eliminate potential safety hazards, improve construction quality, and ensure moisture content. Effect

Active Publication Date: 2022-01-04
BEIJING TIANRUN CONSTR
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the shortage of land, many construction sites have narrow spaces, and the outer edge of the building structure is too close to the construction enclosure.
It directly leads to the excavation of the earthwork, the upper line of the foundation pit is too close to the construction enclosure, even less than one meter
When the groundwater level is high and the deep foundation pit requires dewatering work, it is impossible to construct a dewatering well on the top of the foundation pit
[0003] When the surrounding area of ​​the foundation pit is too narrow and the top of the foundation pit cannot be arranged with a dewatering well, the dewatering well can be arranged at the bottom of the foundation pit after the earthwork operation is completed. However, during the excavation process, due to the high groundwater level Wet soil increases the construction difficulty of earthwork excavation
Or, arrange temporary dewatering wells during the excavation of the earthwork, and then arrange dewatering wells at the bottom of the foundation pit and in the working face outside the outer edge of the structure after the excavation of the foundation trench is completed, but this will increase the construction cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for foundation pit dewatering well and earthwork intersecting operation
  • A construction method for foundation pit dewatering well and earthwork intersecting operation
  • A construction method for foundation pit dewatering well and earthwork intersecting operation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] In order to make the technical problems solved by the present invention, the technical solutions adopted and the technical effects achieved clearer, the technical solutions of the embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only the technical solutions of the present invention. Some, but not all, embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative efforts fall within the protection scope of the present invention.

[0039] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" etc. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describin...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of building construction, and discloses a construction method for intersecting operation between a foundation pit dewatering well and earthwork. The foundation pit dewatering well and earth work cross-operation construction method includes: taking the intersection of the foundation pit slope protection and the initial surface of the groundwater level as the construction position of the dewatering well; Cut off part of the dewatering well during the excavation of the earthwork until the earthwork is excavated to the initial level of the groundwater level; continue to excavate the earthwork until the excavation of the foundation pit is completed. The invention solves the difficulty of completing the dewatering construction at the well point in the narrow construction site. By constructing the dewatering well on the slope protection of the foundation pit, it avoids the outer edge of the building structure and does not affect the working surface of the construction of the outer wall structure of the building. , and avoid the narrow distance between the upper line of the foundation pit and the construction enclosure, and eliminate potential safety hazards. The dewatering operation can be carried out while the earthwork is being constructed, so that the bottom of the foundation pit is always kept dry.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a construction method for cross-operation between a foundation pit dewatering well and earthwork. Background technique [0002] At present, on the construction site, the dewatering wells for the common well point dewatering construction are generally arranged on the top of the foundation pit, which is conducive to the construction of the dewatering well and can still pump water in the process of backfilling the fertilizer tank. However, due to the shortage of land, many construction sites have narrow spaces and the outer edge of the building structure is too close to the construction enclosure. As a result, when the earthwork is excavated, the top line of the foundation pit is too close to the construction fence, even less than one meter. When the groundwater level is high and the deep foundation pit requires dewatering operations, it is impossible to construct the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D19/10E02D17/00
CPCE02D19/10E02D17/00
Inventor 初彦辰于赫男严新建
Owner BEIJING TIANRUN CONSTR