Bonded post-tensioned prestressed anchoring construction method for cast-in-place concrete structure
A technology of pouring concrete and post-tensioning prestressing, which is applied in the field of concrete structure rods or walls, can solve the problems that the anchoring effect cannot be guaranteed, and achieve the effects of durability guarantee, no impact on construction period, and high quality assurance rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0052] The pouring concrete structure of the present invention has bonded post-tensioning prestressed anchorage construction method, which solves the cracks caused by the buoyancy of groundwater to the tensile stress of the reinforced concrete structure of the underground building, and at the same time makes the tensioned prestressed steel strand permanently bonded with the concrete . It uses the design unit to design the reinforcement ratio of reinforced concrete structures in underground engineering, and determines the configuration of steel bars and prestressed steel strands and the design of prestressed length. The realization of prestressing is to make the reinforcement cage of the underground structure, install the anchor steel check valve at the bottom of the steel conduit, connect the reinforcement cage, cast the concrete in situ, insert the prestressed steel strand, build the underground structure, wait for the concrete After the structure is formed and the maintenanc...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 