Resource-constrained project scheduling optimization method based on layered two-stage intelligent algorithm
A resource-constrained, intelligent algorithm technology, applied in the fields of information technology, systems engineering, and computer technology, to solve problems such as dependencies, incomplete search spaces, and inability to apply precise algorithms to large-scale problems.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0117] Combine below figure 1 , figure 2 The present invention will be further described in detail with reference to and examples, but the present invention is not limited to the following examples.
[0118] A project consists of 20 tasks numbered from 0 to 19, and the timing relationship between tasks is as follows: figure 2 As shown, task 0 and task 19 are artificially added virtual tasks, that is, they do not occupy the project duration or resources. The usable amount of resource 1 at any time is 12, and the usable amount of resource 2 at any time is 13.
[0119] task number execution time Demand for resource 1 The demand for resource 2 task number execution time Demand for resource 1 The demand for resource 2 1 3 9 8 10 2 7 7 2 8 5 7 11 8 3 5 3 9 4 3 12 9 3 1 4 2 8 8 13 6 4 5 5 4 6 9 14 5 7 4 6 3 7 8 15 3 6 8 7 9 4 2 16 4 7 5 8 8 5 3 17 8 4 5 9 4 1 9 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com