Resource-constrained project scheduling optimization method based on layered two-stage intelligent algorithm

A resource-constrained, intelligent algorithm technology, applied in the fields of information technology, systems engineering, and computer technology, to solve problems such as dependencies, incomplete search spaces, and inability to apply precise algorithms to large-scale problems.

Active Publication Date: 2020-03-31
ZHEJIANG UNIV OF TECH
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to overcome the incompleteness of the search space of the heuristic algorithm and the semi-intelligent algorithm combined with the heuristic algorithm, the efficiency of the intelligent algorithm depends on the design of the algorithm itself and the type of the problem, etc. A resource-constrained project scheduling optimization method based on a hierarchical two-stage intelligent algorithm is proposed, which effectively reduces the solution time of the resource-constrained project scheduling problem and improves the solution quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Resource-constrained project scheduling optimization method based on layered two-stage intelligent algorithm
  • Resource-constrained project scheduling optimization method based on layered two-stage intelligent algorithm
  • Resource-constrained project scheduling optimization method based on layered two-stage intelligent algorithm

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0117] Combine below figure 1 , figure 2 The present invention will be further described in detail with reference to and examples, but the present invention is not limited to the following examples.

[0118] A project consists of 20 tasks numbered from 0 to 19, and the timing relationship between tasks is as follows: figure 2 As shown, task 0 and task 19 are artificially added virtual tasks, that is, they do not occupy the project duration or resources. The usable amount of resource 1 at any time is 12, and the usable amount of resource 2 at any time is 13.

[0119] task number execution time Demand for resource 1 The demand for resource 2 task number execution time Demand for resource 1 The demand for resource 2 1 3 9 8 10 2 7 7 2 8 5 7 11 8 3 5 3 9 4 3 12 9 3 1 4 2 8 8 13 6 4 5 5 4 6 9 14 5 7 4 6 3 7 8 15 3 6 8 7 9 4 2 16 4 7 5 8 8 5 3 17 8 4 5 9 4 1 9 ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a resource-constrained project scheduling optimization method based on a layered two-stage intelligent algorithm. The method comprises the following steps: acquiring information required by scheduling optimization; calculating a sorting value and a hierarchical value of the task; initializing a contemporary population; calculating a fitness value by adopting serial individual decoding based on an insertion mode; carrying out evolution in two stages, wherein in the first stage, an algorithm is rapidly converged near an optimal solution by adopting a hierarchy-based crossover mutation operation, in the second stage, parameterized uniform crossover operation and mutation operation based on topological sorting are adopted, a population calculation fitness value is improved by adopting an FBI & D method, and neighborhood extension search is carried out to find the optimal solution; outputting a scheduling optimization scheme. Compared with a traditional single-stagesearch strategy, the method has higher search efficiency and optimization capability.

Description

technical field [0001] The present invention relates to the fields of computer technology, information technology and system engineering, in particular to a resource-constrained project scheduling optimization method, more specifically, to a resource-constrained project scheduling optimization method based on a hierarchical two-stage intelligent algorithm. Background technique [0002] Resource-Constrained Project Scheduling Problem RCPSP (Resource-Constrained Project SchedulingProblem) refers to how to scientifically and rationally allocate resources, arrange task execution sequence and determine its start and completion time under the constraints of resource and task timing relationship, so as to achieve the established goals such as : Optimization of construction period, cost, etc. As more and more modern enterprises adopt project-oriented organizational structure and management mode, RCPSP widely exists in single-piece or small-batch production enterprises such as constr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/04G06N3/12
CPCG06Q10/04G06N3/126
Inventor 叶必卿李蒙正单晓杭李研彪张利谢毅
Owner ZHEJIANG UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products