A technology of water injection system and beach, applied in artificial waterways, water conservancy projects, sea area projects, etc., can solve the problems of mud formation, complicated beach dredging work, and difficulty in keeping the beach clean for a long time, so as to increase diversity and biodiversity. Enriching and reducing the effect of natural disasters
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Embodiment 1: The length of the silted zone of the silt beach 2 along the coast is 230m, and the length of the excavated water injection ditch 1 is 240m. The extremely high water level in this sea area once in a century is 5.90m, the design high water level is 4.83m, the design low water level is 0.57m, and the extremely low water level in a century is -0.63m. The slope of the silt beach is 1:60, and the elevation of the excavation sideline of the dug water injection ditch 1 is 5.95m. The width of the dug water injection ditch 1 is 1.5m, and the excavation depth is 0.5m. There is a swimming pool behind the silt beach 2, and the water in the swimming pool needs to be replaced regularly. After the water in the swimming pool is initially filtered, it is injected into the water injection ditch 1. The outer walls 6 on both sides of the water injection ditch 1 are protected by water-permeable plastics. The water injection time is set to 4 hours, and the water injection star...
Embodiment 2
[0044] Embodiment 2: There are two silt zones in the silt beach 2, the lengths of which are 100m and 50m along the coast respectively, and the lengths of the dug water injection ditch 1 are 110m and 60m. The extremely high water level in this sea area once in a century is 6.30m, the design high water level is 5.33m, the design low water level is 1.37m, and the extremely low water level in a century is 0.63m. The slope of the silt beach is 1:50, and the elevation of the excavation sideline of the dug water injection ditch 1 is 6.35m. The width of the dug water injection ditch 1 is 1m, and the excavation depth is 0.5m. It has been detected that the salinity in the silt beach is relatively high, and the water from the open sea 3 can be directly injected into the water injection ditch 1 . In this embodiment, the water injection system is a temporary project, and the water injection system 7 will be dismantled after the muddy state of the silt beach is effectively alleviated, so t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com