High-rise building water feeding construction method based on BIM

A technology for high-rise buildings and construction methods, applied in 3D modeling, image data processing, instruments, etc., can solve the problems of wasting resources and cost, error-prone, high-level users cannot use water, etc., and achieve the effect of reducing usage and saving costs

Pending Publication Date: 2020-05-08
华航环境发展有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, residential buildings or office buildings or other buildings are built higher and higher. Although the land area has been fully utilized, it has brought serious water supply problems. Gradually decrease or even disappear, causing high-level users to be unable to use water. To solve this problem, the usual method is to manually record data

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-rise building water feeding construction method based on BIM
  • High-rise building water feeding construction method based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0018] Example 1: figure 1 For the flow chart of the construction method for high-rise buildings of the present invention, refer to figure 1 As shown, a kind of BIM-based high-rise building construction method of the present invention specifically comprises the following steps:

[0019] Step 1: According to the construction drawings of the high-rise building, establish the BIM three-dimensional model of the high-rise building;

[0020] Step 2: Build a water supply optimization model in the BIM three-dimensional model to form a construction model. The water supply optimization model includes: water flow detection points set on each layer of water supply pipelines, control valves for controlling the opening and closing of booster pumps, And a control system connected to the water flow detection point and the control valve;

[0021] Step 3: Input the actual normal initial water pressure parameters of the high-rise building into the construction model to simulate the water filli...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a high-rise building water feeding construction method based on BIM, which comprises the following steps of establishing a BIM three-dimensional model of a high-rise buildingaccording to a construction drawing of the high-rise building; constructing a water feeding optimization model in the BIM three-dimensional model to form a construction model, wherein the water feeding optimization model comprises a water flow detection point arranged on each layer of water feeding pipeline, a control valve for controlling opening and closing of a booster pump, and a control system connected with the water flow detection point and the control valve. According to the invention, three-dimensional simulation of the actual water feeding process is carried out by using the BIM technology; the arrangement of an existing additional pump system is optimized, use of the booster pump is reduced under the condition that normal water feeding is met, cost is reduced, the efficiency ofthe booster pump is maximized, and opening and closing of the booster pump can be automatically regulated and controlled in real time through the control system according to the water feeding condition of each layer.

Description

technical field [0001] The invention belongs to the technical field of building construction, and in particular relates to a BIM-based high-rise building watering construction method. Background technique [0002] At present, residential buildings or office buildings or other buildings are built higher and higher. Although the land area has been fully utilized, it has brought serious water supply problems. Gradually decrease or even disappear, causing high-level users to be unable to use water. To solve this problem, the usual method is to manually record data on site, record and detect water pressure through a detector, and then calculate and set up multiple booster pumps at different heights For pressurized water supply, the above traditional methods are cumbersome and error-prone, and they have the defect that the booster pump still works when the water pressure is sufficient, which wastes resources and costs a lot. Contents of the invention [0003] Aiming at the defi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06T17/10G06F30/13G06F30/20
CPCG06T17/10
Inventor 赵妍妍谭健田园园周坤
Owner 华航环境发展有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products