Large-scale grouting supplementing method between segments and surrounding rocks for TBM tunnel construction

A large-scale, tunneling technology, used in tunnels, earth-moving drilling, tunnel lining, etc., can solve the problems of backfilling and grouting of the full section of the supporting trolley, and the lack of comparison documents.

Active Publication Date: 2020-05-19
CHINA RAILWAY 18TH BUREAU GRP CO LTD +1
View PDF8 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 2. For TBM construction with small sections (the net diameter in the tunnel behind the lining segment is less than 5m), due to the limited supporting space, the slag discharge belt, secondary air duct and dust removal duct have occupied the space of the tunnel arch, resulting in The grouting hole in the 90° range on the top is covered, and it is impossible to backfill and grout the entire section on the supporting trolley, resulting in de-grouting
[0009] Through public literature search, no relevant comparative documents were found

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large-scale grouting supplementing method between segments and surrounding rocks for TBM tunnel construction
  • Large-scale grouting supplementing method between segments and surrounding rocks for TBM tunnel construction
  • Large-scale grouting supplementing method between segments and surrounding rocks for TBM tunnel construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] In order to further understand the content, characteristics and effects of the present invention, the following examples are given, and detailed descriptions are given below with reference to the accompanying drawings. It should be noted that this embodiment is descriptive, not restrictive, and cannot thereby limit the protection scope of the present invention.

[0043] A large-scale supplementary grouting method between a segment and surrounding rock in TBM tunnel construction, comprising the following steps:

[0044] Step 1, laying out the grout opening of the pipeline, using the TBM construction water supply steel pipes arranged along the tunnel wall in the tunnel, opening holes in the steel pipe wall at intervals of 50m in the grouting tunnel section, and then laying tee joints at the openings;

[0045] Step 2: Segmentation of the working face, the pipeline in step 1 is sequentially divided into: regulating pressure ramp section 11, controlling pressure section 12 a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a large-scale grouting supplementing method between segments and surrounding rocks in TBM method tunnel construction. The method fills the blank of solving the problem of large-scale refilling grouting of a long tunnel section ubiquitously existing in small-section and long-distance TBM reverse slope tunneling tunnel construction, by utilizing the elevation difference andreverse-slope conditions of a tunnel main branch tunnel, a grouting construction method for carrying out slurry conveying and centralized pressurization by using the existing water supply pipeline intunnel construction is provided, multiple working faces can be carried out simultaneously after TBM tunneling is stopped or completed for some reasons, frequent moving, mounting, moving and operationmaintenance of mechanical equipment are avoided, a large amount of manpower and material resources are saved, the grouting supplementing method is simple in process, short in construction period, highin efficiency and convenient in quality control, and the defects in the prior art is overcome.

Description

technical field [0001] The invention relates to the technical field of tunnel construction, in particular to a large-scale supplementary grouting method between segments and surrounding rocks in TBM tunnel construction. Background technique [0002] 1. In the lining construction of TBM excavation segment, the gap between the segment and the surrounding rock is filled with pea gravel and backfilled with grouting, so that the cemented pea gravel, segment and surrounding rock jointly bear the internal and external loads. At the same time, the pea gravel layer is cemented to form a closed anti-seepage circle, which improves the anti-seepage performance of the tunnel. Full-section backfill grouting needs to be completed on the post-supporting trolley (if possible, the post-supporting design is an upper and lower two-layer structure, and the segment grouting hole should be exposed as much as possible). [0003] Therefore, in the design of the post-supporting functions of the TBM,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10
CPCE21D11/105
Inventor 王灿林王富仓李勇李凌霄王宝友廖建伟
Owner CHINA RAILWAY 18TH BUREAU GRP CO LTD