A large-scale supplementary grouting method between segment and surrounding rock in tbm tunnel construction
A large-scale, tunnel-based technology, which is applied in tunnels, earthwork drilling, tunnel lining, etc., can solve the problems of no comparison documents found, and the inability to backfill and grout the entire section of the supporting trolley, so as to save manpower, avoid frequent relocation, and construction period short effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] In order to further understand the content, characteristics and effects of the present invention, the following examples are given, and detailed descriptions are given below with reference to the accompanying drawings. It should be noted that this embodiment is descriptive, not restrictive, and cannot thereby limit the protection scope of the present invention.
[0043] A large-scale supplementary grouting method between a segment and surrounding rock in TBM tunnel construction, comprising the following steps:
[0044] Step 1, laying out the grout opening of the pipeline, using the TBM construction water supply steel pipes arranged along the tunnel wall in the tunnel, opening holes in the steel pipe wall at intervals of 50m in the grouting tunnel section, and then laying tee joints at the openings;
[0045] Step 2: Segmentation of the working face, the pipeline in step 1 is sequentially divided into: regulating pressure ramp section 11, controlling pressure section 12 a...