Method and device for updating user plane gateway
A user plane and gateway technology, applied in the communication field, can solve problems such as the inability to implement GW-U update
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0095] The embodiment describes in detail how to implement GW-U update under the first mechanism. Such as Figure 4 As shown, under the first mechanism, the first method to realize GW-U update includes the following steps:
[0096] Step 401: The control plane gateway GW-C sends a first message to the mobility management entity MME indicating that the establishment of the first PDN connection is completed. The first packet data network PDN connection is the user equipment UE and the first user plane gateway GW-C. For a PDN connection between Us, the first message carries a notification parameter, and the notification parameter is used to request the MME to notify the GW-C when the tracking area TA where the UE is located changes.
[0097] Step 402: The GW-C receives a notification message sent by the MME, and the notification message is used to notify the GW-C that the tracking area TA where the UE is located changes.
[0098] Step 403: The GW-C determines, according to the n...
Embodiment 2
[0124] Embodiment 2 describes in detail how to implement GW-U update under the first mechanism. Such as Figure 6 As shown, under the first mechanism, the second method of implementing GW-U update includes the following steps:
[0125] Step 601: The control plane gateway GW-C sends a first message to the mobility management entity MME indicating that the establishment of the first packet data network PDN connection is completed, and the first PDN connection is between the user equipment UE and the first user plane gateway GW-C. For a PDN connection between Us, the first message carries a list of TA identifiers corresponding to the first GW-U.
[0126] Step 602: The GW-C receives a notification message sent by the MME according to the first message, the notification message is used to notify the GW-C that the TA identifier of the tracking area TA where the UE is located is not in the TA ID list.
[0127] Step 603: The GW-C sends a request message to the MME for reestablishin...
Embodiment 3
[0153] Embodiment 3 describes in detail how to implement GW-U update under the second mechanism. Such as Figure 8 As shown, under the second mechanism, the first method to achieve GW-U update includes the following steps:
[0154] Step 801: The mobility management entity MME receives the first message sent by the control plane gateway GW-C for indicating that the establishment of the first packet data network PDN connection is completed, and the first PDN connection is between the user equipment UE and the first user plane gateway GW - a PDN connection between Us, the first message carries a list of TA identifiers corresponding to the first GW-U.
[0155] Step 802: The MME determines that the TA identity of the tracking area TA where the UE is located is not in the TA identity list.
[0156] Step 803: The MME initiates a request message for reestablishing a PDN connection to the UE, the request message is used to trigger the UE to initiate a second PDN connection, and the s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


