Unlock instant, AI-driven research and patent intelligence for your innovation.

Cloth color fixing and dyeing process and production equipment thereof

A technology for production equipment and fabrics, which is applied in the field of fabric fixation dyeing process and its production equipment, can solve the problems of waste, incomplete cleaning, unfavorable water conservation, etc., and achieve the effect of reducing production and processing costs

Inactive Publication Date: 2020-06-23
杭州超峰布艺有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The above-mentioned existing technical solutions have the following defects: before the cloth dyeing starts, the cloth needs to be prepared before dyeing. After rinsing, the washing tank is used to wash the cloth for many times, and then the cloth is dyed. After dyeing, clean water is used to clean the cloth. Washing twice, and then soaping, the fabric needs to be washed several times during the whole dyeing process. After each washing,

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cloth color fixing and dyeing process and production equipment thereof
  • Cloth color fixing and dyeing process and production equipment thereof
  • Cloth color fixing and dyeing process and production equipment thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0049] A kind of cloth solid color dyeing process, with reference to figure 1 , including the following steps: S1: pre-dyeing treatment: prepare a bleaching tank, put the fabric to be dyed into the bleaching tank, and use bleaching agent to bleach for 1.5-2.5 hours;

[0050] S2: Cleaning and dehydration: prepare the cleaning tank, water purification device 2 and dehydration device 1, put the cloth into the cleaning tank first, and clean it. The cleaning time is 10 to 15 minutes. After cleaning, put the cleaned cloth into the Go to the dehydration device 1 for dehydration. During this process, the water in the cleaning tank enters the water purification device 2. At the same time, the clean water in the water purification device 2 will be injected into the cleaning tank. Transport to the cleaning tank, repeat this way 3 to 5 times;

[0051] S3: Dyeing: At a temperature of 60°C, prepare clean water with a bath ratio of 1:5-10, add dyes according to the color formula and stir fo...

Embodiment 2

[0060] A kind of production equipment that is applied to cloth solid color dyeing process in embodiment 1, with reference to figure 2 with image 3 , including a dehydration device 1 and a water purification device 2, the dehydration device 1 includes a casing 11, a feed inlet 12 provided on one side of the casing 11, and a discharge outlet located on the opposite side of the feed inlet 12 on the casing 11 13. The drainage port 14 opened on the box body 11, a plurality of extrusion roller groups 15 arranged in the box body 11, a support frame 16 arranged in the box body 11, and a plurality of extrusion roller groups rotatably connected to the support frame 16 Two water rollers 17 and two extruding roller groups 15 are located at both ends of the support frame 16 .

[0061] Wherein bracing frame 16 is provided with two groups symmetrically about cloth width direction, a plurality of squeezing rollers 17 on the bracing frame 16 is provided with along bracing frame 16 lengthwis...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a cloth color fixing and dyeing process and production equipment thereof. The process comprises the following steps of S1, performing dyeing pre-treatment; S2, performing cleaning and dehydrating; S3, performing dyeing; S4, performing washing and color fixing; and S5, performing drying and finishing. The invention also relates to the production equipment for color fixing and dyeing of cloth. The production equipment comprises a dewatering device and a water purifying device. The cloth color fixing and dyeing process and the production equipment in the invention have theadvantages of good water-saving effect, waste reduction and water resource cost reduction.

Description

technical field [0001] The invention relates to the technical field of cloth production, in particular to a cloth fixation dyeing process and production equipment thereof. Background technique [0002] The textile industry is a traditional pillar industry in my country, including five parts: textile, printing and dyeing, chemical fiber, clothing and textile special equipment manufacturing. With the rapid development of the national economy, my country's printing and dyeing industry has also entered a period of rapid development, the level of equipment and technology has been significantly improved, and the production process and equipment have been continuously updated. The printing and dyeing process occupies a pivotal position in the textile industry, and the cost control in the printing and dyeing process directly affects the economic value of the fabric. Therefore, the cost of fabric dyeing process will be strictly controlled. [0003] Dyeing is the process of dyeing f...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): D06B21/00D06B3/10D06B15/00D06B15/02D06B15/09D06B23/20
CPCD06B21/00D06B3/10D06B15/00D06B15/02D06B15/09D06B23/20
Inventor 吴银元
Owner 杭州超峰布艺有限公司