A construction technology for connecting and fixing water supply and drainage pipes in building construction
A technology for water supply and drainage pipes and building construction. It is applied in the direction of buildings, sewer pipe systems, pipes/pipe joints/fittings, etc. It can solve problems such as troublesome disassembly, no mutual binding force between pipes, and inability to fix pipes at the same time. To achieve a strong functional effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A building construction water supply and drainage pipe connection fixing construction process, which mainly utilizes a building construction installation engineering water supply and drainage pipe connection fixing bracket to cooperate to complete, the building construction water supply and drainage pipe connection fixing construction process specifically includes the following steps:
[0041] S1. Installation location construction: Excavate the construction space required for the required pipeline 10 through the existing excavator and manual cooperation;
[0042] S2. Pipe placement: arrange the prepared pipes 10 evenly and side by side in the construction space;
[0043] S3. Pipeline installation: two adjacent pipelines 10 are fixedly connected through the water supply and drainage pipe connection fixing bracket of the building construction and installation project;
[0044] The above-mentioned S1-S3 steps used in the construction and installation project water supply ...
Embodiment 2
[0053] When fixing a plurality of drainage pipes distributed in space, it can also be completed by installing a connecting bracket 60 on the outer wall of the fixing piece 20. The two poles 62 of the T-shaped bar 61 are vertically installed with a cylinder 63 at the end; the outer wall of the cylinder 21 is provided with a semicircular groove 23 extending along its length direction (refer to image 3 ), the semicircular groove 23 is provided with two groups, the semicircular groove 23 does not extend to the top of the cylinder 21, and the opening width of the semicircular groove 23 is smaller than the diameter of the cylinder 63; when installing, first fix the T-shaped bar 61 on the wall Then align the semicircular groove 23 with the two groups of cylinders 63 and then move down until the top of the cylinder 63 is in contact with the top of the semicircular groove 23. By setting the two groups of cylinders 63, the deflection of the fixing member 20 can be restricted;
[0054] ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com