The application discloses a kind of building site foundation pit excavation slope correction device in the technical field of foundation pit excavation slope correction, including scraper, the bottom of scraper is provided with chamfer, the middle position of scraper top is equipped with driving element, eccentric vibration mechanism is installed in driving element, driving element is vertically slidably connected with driving frame, the vertical spring of driving element is fixedly connected with driving element at both ends, driving frame is horizontally slidably connected with rack, the horizontal spring of driving frame is fixedly connected with rack at both sides, angle adjusting mechanism is installed on the top of rack, sliding slot is formed in the both sides of rack, sliding slot is horizontally slidably connected with slide, slide is vertically slidably connected with vertical rod, vertical rod bottom is threadedly connected with the feeding frame slidably connected with scraper, reset spring is fixedly connected between feeding frame and scraper;In the application, scraper is scraped and corrected to slope surface, and soil is recycled, and when pit and depression are encountered, it can be filled and compacted, to reduce the difficulty of slope construction.