BIM-based road soft foundation treatment construction progress visualization method

A technology for construction progress and soft foundation processing, applied in special data processing applications, geometric CAD, etc., can solve problems such as difficult statistics and summary, description of image progress is not intuitive enough, and information is scattered

Pending Publication Date: 2020-08-07
POWER CHINA KUNMING ENG CORP LTD
View PDF8 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the progress management of road soft foundation construction is basically filled in manually, and the amount of construction completed every day is reported in an excel form. The information is scattered and difficult to collect statistics, and the level of information management is low. Secondly, the progress information reported is only a number. The description of the visual progress is not intuitive enough, and it is impossible to carry out effective retrospective analysis on the historical construction progress
At present, BIM technology is widely promoted in the field of engineering construction. The application of BIM to the progress management of road soft foundation construction will effectively improve the management efficiency and visualization effect of the project. However, there are still no application cases and feasible methods in this regard in the current industry.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based road soft foundation treatment construction progress visualization method
  • BIM-based road soft foundation treatment construction progress visualization method
  • BIM-based road soft foundation treatment construction progress visualization method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] Embodiment 1: In order to facilitate the understanding and implementation of the present invention by those of ordinary skill in the art, the present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the embodiments described herein are only used to illustrate and explain the present invention, It is not intended to limit the present invention.

[0024] The BIM-based road soft foundation treatment construction progress visualization method of the present invention includes the following steps:

[0025] Step 1, load the BIM model of the road soft foundation;

[0026] Since the soft foundation earthwork model is generally constructed as a whole, in order to display it in a precise and precise manner with the construction progress, the soft foundation model needs to be divided and cut according to the sub-item division of the project and the construction plan; specifically:

[00...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a BIM-based road soft foundation treatment construction progress visualization method, and relates to an engineering project informatization management application technology,in particular to a BIM-based road soft foundation treatment construction progress visualization method. According to the method, classification and rule cutting are carried out on the road soft foundation BIM model; association from the construction items to the corresponding BIM models is achieved based on the type-space model codes; and a mapping relationship between the construction completionamount of the day and the corresponding model block is established, automatic filling of progress information of the construction model block is completed, and accurate association of the soft foundation BIM model and the construction progress, visual display of the image progress and dynamic backtracking simulation of the historical construction process are achieved. According to the invention, the defects of the existing construction progress management mode are overcome, the integrated management and control of the BIM model and the business are realized, and a more intuitive, three-dimensional and refined progress management method is provided for a project construction manager.

Description

technical field [0001] The invention relates to an engineering project information management application technology, in particular to a BIM-based road soft foundation treatment construction progress visualization method, which is applied to the information management of road engineering construction projects, especially the road soft foundation construction progress visualization management. Background technique [0002] At this stage, the construction of municipal roads in my country is increasing day by day. Due to the soft soil layer in some coastal areas, the settlement requirements are high. Usually, the road needs to be treated with soft foundation for a long time, which is an important link in the process of road construction. The construction progress control of soft foundation treatment has also become an important part of the entire project management. [0003] At present, the progress management of road soft foundation construction is basically filled in manually....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13
CPCG06F30/13
Inventor 赵昕吴学明陈昌黎杨文张卫强谭志伟温耀华刘强仝德华赵亮
Owner POWER CHINA KUNMING ENG CORP LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products