A method of surveying and constructing tower-mast structures
A construction method and tower mast technology are applied in the field of measurement and construction of tower mast structures, which can solve the problems of total station measurement technology being limited by height, greatly affected by precision instruments, and large measurement errors, so as to save measurement adjustment time and increase The effect of large fixed angle and firm initial connection
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] The measurement platform 1 provided in this embodiment includes: a platform body and a positioning hole 6 provided on the platform body.
[0041] Such as figure 1 As shown, the main body of the platform is a regular polygon structure, including: positioning rod 2, auxiliary connecting rod 3, panel 4 and receiving target 5; the positioning rod 2 has four, all adopt channel steel or H-shaped steel, and the two positioning rods The rods 2 are horizontally spaced and arranged in parallel, and the remaining two positioning rods 2 are vertically spaced and arranged in parallel, and the horizontally arranged positioning rods 2 are vertically connected with the vertically arranged positioning rods 2 to form a mesh support frame The auxiliary connecting rods 3 have a plurality of them, which are sequentially connected between the support frames to form a regular octagonal frame, and the center of the regular octagonal frame coincides with the center of the mesh support frame; th...
Embodiment 2
[0046] Such as figure 2 As shown, the tower mast structure in this embodiment is a regular octagonal structure, including eight vertical columns, each of which is provided with a plurality of mounting holes on the top and bottom surfaces of the columns, and each of the mounting holes surrounds The axes of the columns are evenly distributed.
[0047] Utilize the measuring platform 1 that provides in the embodiment one to measure the column of tower mast structure, comprise the following steps:
[0048] Step 1: If figure 2 As shown, three of the columns are divided into the first group, centered on the origin of the construction coordinates, vertically set up respectively and the bottom surface of the first group of columns is temporarily fixed with bolts; wherein, each of the first group of columns Columns are not adjacent to each other.
[0049] Step 2: If image 3 , Figure 4 As shown, correct the position of the first set of uprights: the measurement platform 1 is fixed...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


