Two-stage method frame type bidding and tendering management platform

A management platform and framework technology, applied in data processing applications, commerce, instruments, etc., can solve problems such as increasing the company's influence and right to speak, neglecting attention, and detrimental to the implementation of framework agreements.

Pending Publication Date: 2020-10-27
SINOPEC ENG +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This demand method and bidding procurement method are the root causes of low-level repetitive operations
However, the current situation is that the above-mentioned advanced framework bidding procurement mode cannot be applied to the large category of non-standard products.
[0007] In addition, in the traditional framework bidding process, after signing the framework agreement, the suppliers will provide goods and services according to the buyer's needs from time to time and indefinitely within the agreement period, and the agreement period will be longer Under the circumstances, raw materials, design, labor or transportation costs,

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Two-stage method frame type bidding and tendering management platform
  • Two-stage method frame type bidding and tendering management platform
  • Two-stage method frame type bidding and tendering management platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0054] Preferred embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although preferred embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.

[0055] For engineering design and general contracting enterprises, the material demand mode is based on the core task of ensuring the supply of all materials required for engineering construction projects, and the characteristics of this demand for engineering projects range from large differences in process devices or process technologies, The differences in the scale and capacity of the device, the location and the requirements of the owne...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a two-stage framework type bidding and tendering management platform. The two-stage framework type bidding and tendering management platform comprises a server, a constraint condition setting module, a first-stage bidding module, a first-stage bidding evaluation module, a second-stage bidding module and a second-stage bidding evaluation module, wherein the constraint condition setting module comprises an inherent attribute setting sub-module and a variable attribute setting sub-module; the first-stage bidding module comprises an inherent attribute quotation sub-module and a variable attribute quotation sub-module, wherein the first-stage bid evaluation module comprises a fixed reference unit price evaluation sub-module, a variable unit price evaluation sub-module, aweight coefficient sub-module and a price comprehensive evaluation sub-module; the second-stage bidding module comprises a secondary quotation sub-module, and the second-stage bidding evaluation module comprises a variable attribute final quotation evaluation sub-module and a second-stage comprehensive evaluation sub-module.

Description

technical field [0001] The invention relates to a material procurement management platform for engineering construction projects in the field of energy and chemical engineering, in particular to a two-stage frame-type bidding management platform. Background technique [0002] In the material procurement of engineering construction projects in the traditional energy and chemical industry, procurement personnel can carry out follow-up bidding, bidding, bid evaluation, bid determination, and contract signing after receiving a specific procurement demand. This kind of procurement business is "one-to-one". On the one hand, it cannot effectively integrate material needs, and the negotiation weight with suppliers is relatively light, and the space for cost reduction is limited; on the other hand, business personnel repeat operations at a low level day after day, and the labor intensity is high. , Procurement efficiency is low. [0003] The investment in energy and chemical enginee...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q30/08G06Q10/08G06Q10/10
CPCG06Q10/087G06Q10/103G06Q30/08
Inventor 马彦根郑立军熊建新谢君杨振华尹雯
Owner SINOPEC ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products