Self-driving well capable of achieving self-injection and self-production in same well and same layer and production method
A mining method and self-driving technology, applied in the field of oil and gas field exploration and development, can solve the problems of high production cost, large seepage resistance, and many wells, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0037] Such as Figure 1 to Figure 8 As shown, the present invention provides a self-driving well for self-injection and production in the same well and the same layer, which includes: a vertical well section 15, which is provided with an oil pipe 4 and a casing 5, and the casing 5 is sleeved on the oil pipe 4 In addition, an oil-casing annulus 6 is formed between the oil pipe 4 and the casing 5; at least one production well section 10 is located in the downhole reservoir 1, and at least one production well section 10 communicates with the oil pipe 4 To form a production passage, the first production mechanism 12 is provided in the production passage; at least one injection well section 11 is located in the reservoir 1, at least one injection well section 11 is connected to the oil jacket The annulus 6 is connected to form an injection-production channel.
[0038]Specifically, the production well section 10 includes a horizontal production well section 101 and a deflection pr...
Embodiment approach 2
[0050] Such as image 3 and Figure 4 As shown, the present invention also provides a mining method of the self-injection-production self-driving well in the same well and the same layer as described in Embodiment 1, the self-injection-production self-driving well in the same well and the same layer in this embodiment and The structure, working principle and beneficial effects of Embodiment 1 are the same, and will not be repeated here. The mining method comprises the steps of:
[0051] (a) Sidetracking or fracturing at least one injection well section 11 and at least one production well section 10 corresponding to the reservoir 1 on the vertical well section 15, the injection well section 11 is separated from the production well section 10 set up;
[0052] (b) adding injection fluid along the injection-production channel, and injecting the injection fluid into the reservoir 1 after entering each injection well section 11 through the injection-production channel;
[0053] ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



