Street lamp construction resource scheduling method and system, storage medium and device

A resource scheduling and street lighting technology, applied in resources, instruments, data processing applications, etc., can solve problems affecting efficiency, large amount of calculation, limited manpower and equipment resources, etc., to save time spent, increase resource density, reduce blindness effect

Pending Publication Date: 2020-12-08
STATE GRID BEIJING ELECTRIC POWER +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The construction of IoT street lights is a complicated project. It not only needs to complete the traditional construction procedures (tasks) such as the laying of underground pipelines, pipes, and electrical equipment, but also the installation of smart lights on the multi-functional light poles. Facilities, to complete the construction and debugging of the background system, the process steps are many, closely connected, and multiple tasks need to be constructed simultaneously, but manpower and equipment resources are limited, and the use of resources such as personnel and vehicles may compete with each other
[0003] In actual engineering, it is very common to configure multiple resources for each task. The construction and installation of IoT street lamps involves the allocation of multi-task and multi-resource issues. One method of resource scheduling is to use key processes to allocate resources first. The resource allocation plan obtained based on this method usually cannot obtain the shortest duration; the other method is the "exhaustive method", which combines all resource allocation methods. Try it again and find the method of allocating resources with the smallest construction period. This kind of calculation is too large, which greatly affects the efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Street lamp construction resource scheduling method and system, storage medium and device
  • Street lamp construction resource scheduling method and system, storage medium and device
  • Street lamp construction resource scheduling method and system, storage medium and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0044] one,

[0045] Embodiments of the present invention provide a resource scheduling method, system, storage medium and device for street lamp construction. The principle is: for tasks that are performed at the same time, resources should be allocated as early as possible for the last task to complete. In order to overcome the disadvantage of large amount of calculation, a heuristic algorithm is adopted: ① allocate resources with the earliest start time of the task; ② allocate resources with the smallest free time difference (according to the activities on the key line). ① and ② are used together.

[0046] The idea of ​​the task resource intensity scheduling established by the present invention is: in a certain period of time, such as when t=0, when multi-task and multi-resource conflicts occur in the (t, t+1) time period, first resolve the maximum resource intensity (resource load highest value) resource conflict.

[0047] Such as figure 1 As shown, the resource scheduling...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a street lamp construction resource scheduling method and system, a storage medium and a device. The resource scheduling method preferentially arranges a task with the highestresource demand degree on the whole, so that the centralized utilization of resources is achieved, scarce resources can be liberated from the task as soon as possible, and the impact on other tasks can be ended as soon as possible so as to shorten the engineering construction period as much as possible.

Description

technical field [0001] The invention belongs to the technical field of street lamp construction, and in particular relates to a resource scheduling method, system, storage medium and device for street lamp construction. Background technique [0002] With the accelerated pace of smart cities, IoT street lights will be built and promoted in business districts around Beijing. The construction of IoT street lights is a complicated project. It not only needs to complete the traditional construction procedures (tasks) such as the laying of underground pipelines, pipes, and electrical equipment, but also the installation of smart lights on the multi-functional light poles. Facilities, to complete the construction and debugging of the background system, there are many steps in the process, closely connected, and multiple tasks need to be constructed simultaneously. However, manpower and equipment resources are limited, and the use of resources such as personnel and vehicles may comp...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/06311G06Q10/06316G06Q50/08
Inventor 覃炜瞳
Owner STATE GRID BEIJING ELECTRIC POWER